October 18, 1999 (�(�:_10'rporndon <br /> Page 2 A Member of The IT Croup <br /> ground surface using and 8-inch diameter hollow stem augers. The <br /> boring will be sealed to ground surface with a bentonite grout mixture. <br /> Report. A letter report documenting groundwater monitoring well <br /> abandonment will be prepared after-completion of fieldwork. <br /> Field and laboratoryprocedures are presented as Atta hment A. <br /> SCHEDULE <br /> IT is prepared to initiate f eldwork following work pl approval, the issuance of necessary <br /> permits and availability of drilling the contractor. A I etter report documenting completion <br /> of well abandonment will be submitted approximate) 2 to 4 weeks following completion <br /> of field work. <br /> If there are any questions regarding the contents oft s work plan,please call us at(916) <br /> 858-2350. <br /> Sincerely, <br /> IT Corporation <br /> Kathleen Waldo <br /> t <br /> Staff Engineer <br /> i <br /> 3 <br /> Mark Capps <br /> Project Geologist <br /> RG 6561 <br /> Attachments: Figure 1 - Site Map j. <br /> Attachment A - Field Procedures j <br /> cc: Mr. Michael Infurna, San Joaquin County Public,Health Services <br /> Mr. Michael Smith, Regional Water Quality Control Board, Central Valley Region <br /> 911-007.1 B/0102/Abandon <br />