Laserfiche WebLink
4 <br /> Purdom&Bettenc <br /> ourt <br /> Page 3 <br /> Soil&Groundwater Investigation <br /> Project No. 959.2 <br /> July 12,2001 d <br /> 3.0 SCHEDULE & REPORTING <br /> Geological Technics Inc. anticipates beginning fieldwork within 30 days of receipt of work + <br /> plan approval. The inforri ation gathered during this phase of work will be presented in a <br /> report, which will include a summary of the geology as well as the results of sample <br /> analyses. Dr. Ray Kablanow, a registered professional geologist, will-supervise the project. h <br /> t, Copies of the report will be forwarded to both the appropriate County agency. <br /> 4.0 SIGNATURES & CERTIFICATION <br /> Geological Technics Inc. will perform.this project in,accordance with accepted geologic and <br /> hydrologic standards of the State of California accepted and in effect at the time of this <br /> investigation. Geological Technics Inc. is not responsible for undisclosed conditions. <br /> This work plan was prepared by: <br /> Geofogicaf Tecfmirs Inc. <br /> 1 <br /> i <br /> Jos D. Art o <br /> Geologist ���ESStO <br /> R.I.V"LA O►0 g <br /> Raynold 1. Kablanow II, Ph.D. *�} . 7` . 0 r <br /> California Registered Geologist#5234 OF <br /> Certified Hydrogeologist#442 <br /> f <br /> ice+ � <br />