My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
853
>
2900 - Site Mitigation Program
>
PR0508124
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2020 1:18:26 PM
Creation date
7/27/2020 11:41:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0508124
PE
2950
FACILITY_ID
FA0007949
FACILITY_NAME
7 ELEVEN #21756
STREET_NUMBER
853
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22332015
CURRENT_STATUS
01
SITE_LOCATION
853 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Work Plan for Subsurface Investigation March 23, 1 <br /> The Southland Corporation, Store No.21756,Manteca,California Page March 2 <br /> 2 <br /> SOIL SAMPLING AND ANALYSIS <br /> Five soil borings will be installed in the vicinity of the former UST pit to la depth of 25 feet below ground surface <br /> (BGS) using a direct push geoprobe (soil boring depth will be increased if groundwater is not encountered at <br /> 25 feet BGS). During the drilling, soil samples will be collected at five foot intervals from surface to maximum <br /> borehole depth and logged using the Unified Soil Classification System by an IT Corporation field geologist, <br /> working under the supervision of a California registered geologist. Soil at each depth interval will be evaluated <br /> on site for relative hydrocarbon content using a field instrument. Samlples collected for laboratory analysis will <br /> be sealed with plastic caps over Teflon film, taped, labeled, placed on�ce and sent to a state certified laboratory <br /> under chain of custody. These will be analyzed for benzene, toluene? ethylbenzene, total xylenes, MTBE and <br /> total petroleum hydrocarbons as gasoline (TPH-g) following EPA method 8020/8015(modified). MTBE will be <br /> confirmed using EPA method 8260. All sampling equipment will be cleaned between sampling intervals using <br /> detergent and rinsed with deionized water. Boreholes will be back filled to grade with bentonite. <br /> t <br /> 1 <br /> GROUNDWATER SAMPLING <br /> Groundwater is estimated to be 20 feet BGS at this site. Groundwater samples will be collected from each <br /> borehole, sealed, labeled, placed on ice and send to a state certified laboratory under chain of custody. These <br /> samples will be analyzed for BTEX, MTBE and TPH-g using EPA method 8020/8015(modified). MTBE will be <br /> confirmed using EPA method 8260. <br /> REPORTING AND-REQUEST FOR CLOSURE .i <br /> IT Corporation will prepare a report summarizing the data collected sunder the scope of work detailed above. <br /> i <br /> The report will document the methods and results of the work, summarize laboratory analytical results and <br /> include appropriate maps. <br /> IT Corporation, on behalf of the Southland Corporation, will request site closure pending the outcome of the <br /> soil and water sample analytical results. If closure is not warranted, a work plan for the installation of <br /> monitoring wells and a quarterly monitoring and sampling plan will b'�submitted to the SJCEHD. <br /> i <br /> I <br /> f <br /> 1 <br /> i <br /> :I <br /> i <br /> I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.