My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2300 - Underground Storage Tank Program
>
PR0231923
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2021 3:43:10 PM
Creation date
7/27/2020 2:14:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231923
PE
2361
FACILITY_ID
FA0003606
FACILITY_NAME
ARCO 05450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
01
SITE_LOCATION
1617 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P/: <br /> San Joaquin VHEALTHY AIR LIVING' <br /> wvtw healthyairliving . cam <br /> AIR POLLUTION CONTROL DISTRICT Make one change for clean air! <br /> TP 2013 <br /> UST Static Pressure Performance Test Report Form <br /> Permit Number: N-83 Test Company: Gettler-Ryan Inc. <br /> Site Name: Arco 5450 Technician: Matthew Cambell <br /> Site Address: 1617 W Fremont Certification Number Expiration Date <br /> City: Stockton Zip : 95203 District: SJV 0338 3/31 /2020 <br /> Date/Time of Test: 10/15/2019 <br /> TEST INFORMATION <br /> Total number of nozzles: 8 Are the tanks manifolded? pp Yes p No <br /> Phase I vapor recovery system executive order (as referenced on Permit to Operate) VR- 102 <br /> Phase I1 vapor recovery system executive order (as referenced on Permit to Operate) VR-203 <br /> Nitrogen introduction point [p Phase I vapor coupler ❑ Phase 1I vapor riser <br /> Pressure measuring device ❑ incline manometer p digital manometer ❑ mechanical gauge <br /> Calibration date for pressure measuring device (must be within 90 days of the test) 9/24/2019 <br /> Ending value for digital manometer drift test if applicable (must be 0.01 in. w.c. or less) 0.00 <br /> Initial tank ullage pressure (vent if over 0. 5 in, w.c.) 0.00 <br /> Nitrogen introduction flow rate, F (must be between I and 5 CFM) 2CFM <br /> Calculated ullage fill-time, t2 02 V / 1522 x F) 7 Min 17 Sec <br /> Actual fill-time 7 Min 10 Sec <br /> Number of hoses with over 100 ml (balance hoses must be drained prior to testing) 0 <br /> TANK INFORMATION <br /> Tank No. 1 2 3 4 ALL <br /> Productgrade 87 87 91 <br /> Actual tank capacity (gallons) 11627 11627 11627 <br /> Gasoline volume (gallons) 3644 4620 2927 <br /> Ullage, V (gallons) 17983 8007 1 8700 24690 <br /> t <br /> If tanks are not manifolded, number of nozzles 0 00 0 <br /> 2 IN , W.C. STATIC PRESSURE TEST <br /> Test No. 1 2 3 4 5 <br /> Start time BMW <br /> Initial Pressure, inches of water column (in , w.c . ) 2.00 <br /> Pressure at one minute, in. w.c . 2.1N <br /> Pressure at two minutes, in. w.c. 2 ,00 <br /> Pressure at three minutes, in. w.c. 200 <br /> Pressure at four minutes, in . w.c. 1 .s9 <br /> Pressure at five minutes, in. w.c. 1 .99 <br /> Allowable minimum pressure, in. w.c. 1 1 .94 <br /> Pass / Fail (enter "GF" for gross failure) PASS <br /> I declare, tinder penalty of perjttry tinder the laws of the state of California that based on information and belief formed <br /> after reasonable inquiry, the statements and information provided in this document are trite, accurate, and complete. <br /> 10/ 15/2019 <br /> Signature of Technician . Date: <br /> i <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.