My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2300 - Underground Storage Tank Program
>
PR0231923
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2021 3:43:10 PM
Creation date
7/27/2020 2:14:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231923
PE
2361
FACILITY_ID
FA0003606
FACILITY_NAME
ARCO 05450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
01
SITE_LOCATION
1617 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin VHEALTHY I LIVING' <br /> www , healthyairliving . com <br /> AIR POLLUTION CONTROL DISTRICT Make one change for clean air' <br /> TP-201 . 1 C/D <br /> Leak Rate of Drop Tube/Drain Valve Assembly and Leak Rate of Drop Tube Overfill Protection <br /> Devices and Spill Container, Drain Valves Report Form <br /> Permit Number: N-83 Test Company: Gettler--Ryan, Inc. <br /> Site Name : Arco 5450 Technician: Matthew Campbell <br /> Site Address: 1617 W Fremont Certification Number Expiration Date <br /> City: Stockton Zip : 95203 District: SJV-0338 3/31 /2020 <br /> Date/Time of Test: 10/15//2019 <br /> DROP TUBE DRAIN VALVE AND OVERFILL PROTECTION DEVICE PRESSURE INTERGITY TEST <br /> ❑ Straight Drop Tubel IN Drop Tube with an Overfill Protection Device' <br /> Pressure measuring device § digital manometer ❑ mechanical gauge <br /> Calibration date for pressure measuring device (must be within 180 days of the test) 9/24/2019 <br /> Ending value for digital manometer drift test if applicable (must be 0 .01 in . w.c. or less) 10. 00 <br /> Drop Tube Drain Valve Pressure Test : Drop Tube Overfill Device Pressure Test : "Corrected" Overfill Device Leak Rate <br /> Flow rate 80 nrUWin Flow rate 200 ml/min <br /> Time to reach 2 in. Drain valve Final Time to reach 2 in. Overfill Final Overfill Minus Equals <br /> w.c. at 80 ml/min Ieak rate3 pressure w.c. at 200 ml/min leak rate pressure Device Drain Valve Corrected <br /> Leak Rate Leak Rate Leak Rate <br /> Tank Grade mins. mi/min in. w.c . minse ml/min in . w.c. ml/min ml/min ml/min <br /> 1 87 T2 11 Sec 10ML 2. 18 3 Min 14 Sec 10ML 2. 04 10ML 10ML OML <br /> 2 91 9 Sec 10ML 2.24 3 Min 31 Sec 10ML 2. 10 10ML 10ML OML <br /> 3 <br /> 4 <br /> NOTES : A straight drop tube must be tested with a bladder in place and using a flow rate of 80 ml/min. <br /> 'The bladder section of TP-201AD may be skipped if the entire drop tube passes with a leak rate below 80 ml/min. <br /> 'Leak rate = nitrogen flow rate needed to maintain a constant pressure (at least 2 in . w.c.) for 30 seconds. <br /> 1 declare, under penalty of perjury under the laws of the state of California that based on information and beliefformed after reasonable inquiet; the <br /> statements and information provided in this document are true, accurate, and complete. <br /> Signature of Technician : 7 (4 l' 441 Date: 10/ 15/2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.