My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2300 - Underground Storage Tank Program
>
PR0231923
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2021 3:43:10 PM
Creation date
7/27/2020 2:14:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231923
PE
2361
FACILITY_ID
FA0003606
FACILITY_NAME
ARCO 05450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
01
SITE_LOCATION
1617 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix B <br /> 71 SO Overfill Valve in Tank Shut off Level Worksheet <br /> Important: This is meant to be supplemental worksheet and not a substitute to following the installation <br /> manual instructions. All length measurements are in inches. Please contact the Authority Having Jurlsdic- <br /> tion (AHJ ) and review local, state, and national codes to determine the regulatory requirements governing <br /> shut-off capacity in your region, as well as take into account other considerations such as extreme tank tilt. <br /> Take the following measurements with the valve m= <br /> stalled in the tank: r, <br /> Distance from the 71 SO inlet tube flange to the cast <br /> lug in the 71 SO body (see figures), upper tube length . <br /> Note: the Upper Tube Length must be at least 16" to in- <br /> clude the protective bend in the tube. <br /> ( D) = SO 11 , <br /> Distance from the 71 SO inlet tube flange to the top and <br /> bottom of lower tube, valve length. ' <br /> (W) = \ Iq 15 <br /> (U ) = • < y Upper <br /> Tube <br /> Distance from the 71 SO inlet tube flange to the bottom <br /> of the tank. Note: If a tank bottom protector is present it <br /> may be necessary to add this thickness to dimension <br /> (OPW 6111 & 61TP models add 0.6") (1M Valve <br /> (B) = 3 Length, <br /> bottom of <br /> From the tank calibration chart provided by tank manu- P L cut ; <br /> facturer find the dipstick number (Y) which corresponds <br /> to the 100% volume. (B) <br /> {y) = C� `Z ' _ 7o Tank <br /> (Y) <br /> 1 . To determine shut-off percentage: Tank I) <br /> Subtract upper tube length (D) from distance to tank (U) Valve Chart <br /> bottom (B) C� Length, 100% i <br /> (X) = (B ) � ( D ) - 2' = V U top of cut Volume 4 <br /> Dipstick <br /> Using the tank calibration chart provided by the tank <br /> manufacturer determine the tank capacity at the cal- <br /> culated (X) dimension and the 100% volume (Y) tank <br /> capacity. <br /> {X) tank capacity in gallons = <br /> (Y) tank capacity in gallons . <br /> SO% = (X) capacity / (Y) capacity x100 <br /> Note: The overfill valve must be installed per AHJ require- <br /> ments and all applicable local, state, and national codes. If <br /> the overfill valve is set above the allowable shut- off percent- <br /> V age the overfill valve must be removed and replaced. For <br /> reference 40 CFR part 280 Subpart B Section 280.20 overfill <br /> valves should be set to a maximum of 95%. <br /> 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.