Laserfiche WebLink
Appendix B <br /> 71 SO Overfill Valve in Tank Shut off Level Worksheet <br /> Important: This is meant to be supplemental worksheet and not a substitute to following the installation <br /> manual instructions. All length measurements are in inches. Please contact the Authority Having Jurisdic- <br /> tion (AHJ) and review local, state, and national codes to determine the regulatory requirements governing <br /> shut-off capacity in your region, as well as take into account other considerations such as extreme tank tilt. <br /> Take the following measurements with the valve in- <br /> stalled in the tank: <br /> Distance from the 71 SO inlet tube flange to the cast <br /> lug in the 71 SO body (see figures), upper tube length. <br /> Note: the Upper Tube Length must be at least 16" to in- <br /> elude the protective bend in the tube. <br /> Distance from the 71 SO inlet tube flange to the top and <br /> bottom of lower tube, valve length . <br /> (W) = _ X a 4" (d) <br /> Upper <br /> Tube <br /> Distance from the 71 SO inlet tube flange to the bottom j I <br /> of the tank. Note: If a tank bottom protector is present it <br /> may be necessary to add this thickness to dimension <br /> (OPW 6111 & 61 TP models add 0.6") (IN) Valve <br /> ( B) length, <br /> bottom of <br /> From the tank calibration chart provided by tank manu- cut <br /> facturer find the dipstick number (Y) which corresponds <br /> to the 100% volume, (B) <br /> (Y) = G{ To Tank + <br /> (Y) <br /> 1 . To determine shut-off percentage: Tank <br /> Subtract upper tube length (D) from distance to tank ( U) valveI <br /> Chart <br /> bottom (B) _ � , Length, 100% <br /> (X) _ (B) — ( D ) - 2" = top of cut Volume pi' <br /> Dipstick 01 <br /> Using the tank calibration chart provided by the tank I 1t <br /> manufacturer determine the tank capacity at the cal - <br /> culated (X) dimension and the 100% volume (Y) tank <br /> capacity. f <br /> (X) tank capacity in gallons <br /> (Y) tank capacity in gallons <br /> SQ% = (X) capacity / ( Y) capacity x100 +` Ci L G <br /> Note: The overfill valve must be installed per AHJ require- <br /> ments and all applicable local, state, and national codes. If <br /> the overfill valve is set above the allowable shut- off percent- <br />; age the overfill valve must be removed and replaced. For <br /> reference 40 CFR part 280 Subpart B Section 280.20 overfill <br /> •� Q valves should be set to a maximum of 95%. <br /> I 21 <br /> I <br />