My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2300 - Underground Storage Tank Program
>
PR0231923
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2021 3:43:10 PM
Creation date
7/27/2020 2:14:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231923
PE
2361
FACILITY_ID
FA0003606
FACILITY_NAME
ARCO 05450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
01
SITE_LOCATION
1617 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
71SO-TOOL PROCEDURE BELOW, <br /> FOR 71 SO-TOOLC, SEE PAGE 9 Caution: If the drill stop is not in the proper <br /> location failure of a pressure decay leak test may <br /> result. <br /> STEP 9A: INSERT 71SO-TOOL OVER INLET <br /> TUBE 71 SO-TOOL <br /> To install the 71 SO-TOOL (sold separately) over the <br /> inlet tube, first loosen all three knobs, so the tool can <br /> pass freely over the inlet tube flange. Align the slot o <br /> on the tool with the key on the inlet tube and insert <br /> the tool down. See Figure 9A. <br /> Loosen all Hand <br /> Tool slot knobs View holes tighten Tip to stop dimension <br /> knobs must be 2 to 2-1/16 inch <br /> evenly Figure 11A <br /> STEP 12A: DRILL HOLES <br /> With the inlet tube and 71SO-TOOL in place, <br /> carefully drill a 3/16"diameter hole in the upper tube <br /> using the drill bushing in the knob as a guide. The <br /> drill stop is positioned so it will bottom out against <br /> the knob after the bit has drilled through the upper <br /> Inlet drop tube. If the stop is positioned wrong either no <br /> Tube hole will be drilled, or a through hole could <br /> key potentially be drilled through the inlet tube. If no <br /> hole is drilled return to step 11 and check the stop <br /> dimension. If a hole is drilled through the inlet tube <br /> or into the screw hole the assembly is not <br /> salvageable. Drill (2) more holes in the two <br /> remaining knobs. <br /> Figure 9A Figure 10A <br /> STEP 10A: TIGHTEN THE 71SO-TOOL <br /> Use the three view holes to ensure that the tool <br /> seats out flat against the top of the inlet tube. To <br /> prevent vertical movement of the tool during drilling <br /> hand tighten all three knobs evenly the upper drop <br /> tube. See Figure 10A. <br /> ® Drill thru upper <br /> STEP 11A: PREPARE DRILL AND BIT tube only <br /> Confirm that the stop on the 3/16"drill bit supplied <br /> with the 71SO-TOOL is in the correct position before Figure 12A <br /> drilling. The stop is factory installed at a distance <br /> between 2"to 2-1/16"from the tip with the 71 SO- <br /> TOOL. If the stop is not at the correct position it <br /> must be fixed before drilling. <br /> OPW 71 SO Overfill Prevention Valve Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.