My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2300 - Underground Storage Tank Program
>
PR0231923
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2021 3:43:10 PM
Creation date
7/27/2020 2:14:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231923
PE
2361
FACILITY_ID
FA0003606
FACILITY_NAME
ARCO 05450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
01
SITE_LOCATION
1617 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
71SO-TOOLC PROCEDURE BELOW, Caution: If the drill stop is not in the proper <br /> FOR 71 SO-TOOL, SEE PAGE 8 location failure of a pressure decay leak test may <br /> result. <br /> STEP 913: INSERT 71S0-TOOLC OVER INLET 71 SO-TOOLC <br /> TUBE <br /> To install the 71 SO-TOOLC (sold separately)over o <br /> the inlet tube, first loosen the thumb screw, so the <br /> tool can pass freely over the inlet tube flange. Align <br /> the slot on the tool with the key on the inlet tube and <br /> insert the tool down. See Figure 913. <br /> Tool Slot Hand tighten thumb Tip to stop dimension <br /> ------------ screw must be 1-3/16" to 1-1/4" <br /> -o <br /> o Figure 11 B <br /> Loosen <br /> thumb <br /> screw Z o STEP 1213: DRILL HOLES <br /> With the inlet tube and 71 SO-TOOLC in place, <br /> carefully drill a 3/16"diameter hole in the upper tube <br /> Inlet � using the hole in the 71SO-TOOLC as a guide. The <br /> Tube drill stop is positioned so it will bottom out against <br /> Key the tool after the bit has drilled through the upper <br /> drop tube. If the stop is positioned wrong either no <br /> hole will be drilled, or a through hole could <br /> potentially be drilled through the inlet tube. If no <br /> hole is drilled return to step 11 and check the stop <br /> dimension. If a hole is drilled through the inlet tube <br /> or into the screw hole the assembly is not <br /> salvageable. Drill (2) more holes in the two <br /> remaining guide holes. <br /> Figure 9 Figure 10 <br /> STEP 1013: TIGHTEN THE 71SO-TOOLC <br /> Ensure that the tool seats flat against the top of the <br /> inlet tube. To prevent vertical movement of the tool o <br /> during drilling, hand tighten the thumb screw against <br /> the upper drop tube. See Figure 10B. <br /> STEP 11 B: PREPARE DRILL AND BIT Drill through upper tube only <br /> Confirm that the stop on the 3/16"drill bit supplied <br /> with the 71SO-TOOLC is in the correct position <br /> before drilling. The stop is factory installed at a <br /> distance between 1-3/16"to 1-1/4"from the tip with Figure 12B <br /> the 71 SO-TOOLC. If the stop is not at the correct <br /> position it must be fixed before drilling. <br /> OPW 71 SO Overfill Prevention Valve Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.