My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2300 - Underground Storage Tank Program
>
PR0231923
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2021 3:43:10 PM
Creation date
7/27/2020 2:14:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231923
PE
2361
FACILITY_ID
FA0003606
FACILITY_NAME
ARCO 05450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
01
SITE_LOCATION
1617 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP 13: DIMPLE FIRST HOLE STEP 15: DIMPLE REMAINING HOLES <br /> Remove tool. Remove any chips or burrs from the Remove any chips or burrs from the drilling <br /> drilling operation. Place the assembly on a solid operation. Dimple the next (2) holes as done in Step <br /> surface. Using the punch supplied with the 71 SO- 13. Make sure the assembly is on a solid surface <br /> TOOL and 71SO-TOOLC, align the tip of the punch when punching. After punching, remove any chips <br /> with the drilled hole and dimple the upper drop tube that may have fallen into the inlet tube screw hole. <br /> by striking the punch with a hammer until the drop <br /> tube is formed into countersunk hole in the inlet <br /> tube. After punching, remove any chips that may <br /> have fallen into the inlet tube screw hole. -- - <br /> Align punch with <br /> drilled hole <br /> 0 <br /> Figure 15 <br /> STEP 16: ASSEMBLE OTHER SCREWS <br /> Apply black moly grease to screws and tighten the <br /> other(2)screws into inlet tube with a screwdriver as <br /> done in Step 14. Use only the taptite screws that <br /> are supplied with the unit. Seating torque is 20 in- <br /> lbs min. to 35 in-lbs max. Do not over tighten. <br /> Figure 13 STEP 17: APPLY GREASE TO LOWER O-RING <br /> STEP 14: ASSEMBLE FIRST SCREW AND BODY THREADS <br /> Ensure that the drop tube was formed into the Apply black moly grease to the lower tube o-ring and <br /> countersunk screw hole as shown in Figure 14 if not body threads as shown. Make sure coverage is <br /> return to step 13. Apply black moly grease to screw completely around the o-ring. Install o-ring in groove <br /> and tighten first screw into inlet tube with a just above threads. <br /> screwdriver. Use only the taptite screws that are <br /> supplied with the unit. Seating torque is 20 in-lbs Apply grease <br /> min. to 35 in-lbs max. Screw head should be flush around o-ring <br /> with the drop tube. Do not over tighten. <br /> O-ring <br /> Ensure the drop tube is groove Body threads <br /> formed into countersunk hole <br /> Figure 17 <br /> Figure 14 <br /> OPW 71 SO Overfill Prevention Valve Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.