My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
420
>
2900 - Site Mitigation Program
>
PR0537485
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2020 4:37:12 PM
Creation date
7/27/2020 2:42:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0537485
PE
2957
FACILITY_ID
FA0021568
FACILITY_NAME
FORMER RAINWATER CAR WASH
STREET_NUMBER
420
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
21931206
CURRENT_STATUS
01
SITE_LOCATION
420 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fassel & Amal Elder -2- NOV 19ag <br /> investigative workplanlCorrective Action Plan (CAP)before performing any work. This phasing process <br /> and the workplan/CAP requirements were intended to: <br /> 1. help the responsible party undertake the necessary corrective action in a cost-effective, efficient and <br /> timely manner; <br /> 2. enable the regulatory agency to review and approve the proposed cost-effective corrective action <br /> alternative before any corrective action work was performed; and <br /> 3. ensure the Fund will only reimburse the most cost-effective corrective action alternative required by <br /> the regulatory agency to achieve the minimum cleanup necessary to protect human health, safety and <br /> the environment. <br /> In some limited situations interim cleanup will be necessary to mitigate a demonstrated immediate <br /> hazard to public health, or the environment. Program regulations allow the responsible party to undertake <br /> interim remedial action after: (1)notifying the regulatory agency of the proposed action, and; (2) <br /> complying with any requirements that the regulatory agency may set. Interim remedial action should only <br /> be proposed when necessary to mitigate an immediate demonstrated hazard.Implementing interim <br /> remedial action does not eliminate the requirement for a CAP and an evaluation of the most cost- <br /> effective corrective action alternative. <br /> Three bids and Cost Preapproval: Only corrective action costs required by the regulatory agency to <br /> protect human health, safety and the environment can be claimed for reimbursement. You must comply <br /> with all regulatory agency time schedules and requirements and you must obtain three bids for any <br /> required corrective action. Unless waived in writing,you are required to obtain preapproval of costs for <br /> all future corrective action work. If you do not obtain three bids and cost preapproval, reimbursement <br /> is not assured and costs may be rejected as ineligible. <br /> If you have any questions,please contact me at(916)227-4411. <br /> Sincerely, <br /> Sandy Gill v <br /> Claims Review Unit <br /> Underground Storage Tank Cleanup Fund <br /> cc: Mr. Gordon Boggs <br /> RWQCB,Reg. 5 - Sacramento <br /> 3443 Routier Road <br /> Sacramento, CA 95827-3098 <br /> Ms. Margaret Lagorio <br /> San Joaquin County EHD <br /> P.O. Box 2009 <br /> Stockton,CA 95201 <br /> CaiiforifiaEuvironmeata/PFotectiooA enc; <br /> eA ReeydedPapr, <br />
The URL can be used to link to this page
Your browser does not support the video tag.