Laserfiche WebLink
r <br /> I i <br /> S <br /> 02 March 2005 <br /> AGE-NC Project No 97-0333 <br /> Page 3 of 10 <br /> • Total lead by EPA Method 6010B (influent sample only) <br /> ' 2 4 INFLUENT MONITORING RESULTS' <br /> In accordance with the requirements of CMPWD Industrial Wastewater Discharge Permit No 02-1, <br /> monthly ground water extraction and treatment influent sampling was performed on 19 October, <br /> 11 November, and 30 December 2004 for laboratory analysis of the contaminants listed in <br /> Section 2 3 <br /> During all three monthly monitoring events,Influent water samples detected TPH-g at concentrations <br /> as high as 6,100 micrograms per liter(µg/1)in the November 2004 sample,TPH-d and TPH-mo were <br /> ' not detected In any of the above-referenced samples <br /> I <br /> Various BTEX constituents were detected in all three Influent water samples at concentrations as <br /> high as 370 gg/1 benzene, 120 pg/l ethylbenzene, and 1,000 gg/1 xylenes from the November 2004 <br /> sample, and 850 µg/1 toluene from the December 2004 sample <br /> ' • MTBE was detected(EPA Method 8260B)in all three Influent samples at concentrations as high as <br /> 2,400 µg/1 in the November sample, TAME was detected In all three Influent samples at <br /> 1 concentrations as high as 91 gg/l In the November sample, TCE was detected in all three Influent <br /> samples at concentrations as high as 23 µg/1 in the December sample,PCE was detected in all three <br /> Influent samples at concentrations as high as 1,100 µg/1 in the December 2004 sample <br /> The laboratory analysis did not detect any other constituents of concern Analytical results of <br /> extraction and treatment Influent water samples(CTEL Project Nos CT214-0410108,-0411165,and <br /> ' -0412245) are summarized in Table 2, laboratory reports are Included In Appendix A, GeoTracker <br /> confirmation pages of the submitted laboratory electronic deliverable format(EDF)files are Included <br /> in Appendix B <br /> 25 EFFLUENT MONITORING RESULTS <br /> Industrial Wastewater Discharge Permit No 02-1 <br /> I In accordance with the requirements of CMPWD g , <br /> monthly ground water extraction and treatment effluent monitoring was performed on 19 October, <br /> 11 November,and 30 December 2004 for flow rate and laboratory analysis of the contaminants listed <br /> In Section 2 3 <br /> ' Laboratory analysis of extraction and treatment effluent grab water samples did not detect any <br /> • constituents ofconcern Analytical results are summanzed in Table 2,laboratoryreports are included <br /> ' w Advanced GeoEnvrrunmental,Inc <br />