My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
941
>
3500 - Local Oversight Program
>
PR0545913
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2020 8:17:02 PM
Creation date
7/27/2020 4:35:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545913
PE
3528
FACILITY_ID
FA0005531
FACILITY_NAME
TEXACO SERVICE STATION
STREET_NUMBER
941
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
CURRENT_STATUS
02
SITE_LOCATION
941 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•rJ <br /> ,a <br /> Work Plan for Re-excavation May 3 , 1989 <br /> Former Texaco Service Station, Manteca, California AGS 38053-1 <br /> Site Safety Plan <br /> Work' at the site will be performed under the provisions of a Site <br /> Safety Plan. This plan will describe the basic safety <br /> requirements for the subsurface environmental investigation i <br /> related to removing soil by excavation and soil sampling. <br /> Applied GeoSystems will contact Underground Services Alert to <br /> locate public utility lines at the site before excavating. The <br /> location of the proposed excavation is, shown on Plate P-2 . <br /> Removal of Product-Deliver Lines and Soil Sam lin <br /> A Class A licensed contractor will remove" the underground <br /> product-delivery lines. Applied Geos stems will notify the <br /> appropriate authorities and have a re resentative present onsite <br /> to observe removal of the underground product-delivery lines. <br /> i <br /> Soil will be removed from above and alongside the product- <br /> delivery lines with an excavator and the lines will be removed. <br /> one soil sampleTwill then be collected from native soil <br /> approximately every 20 linear feetl'be eathtthe locations of the <br /> 1 <br /> removed underground .!,product-delivery... Ines. The proposed soil <br /> i <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.