My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1994 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
1443
>
2231-2238 – Tiered Permitting Program
>
PR0507023
>
COMPLIANCE INFO_1994 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2020 12:24:44 PM
Creation date
7/30/2020 7:45:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
1994 - 2018
RECORD_ID
PR0507023
PE
2232
FACILITY_ID
FA0001542
FACILITY_NAME
VIKTRON EXPRESS
STREET_NUMBER
1443
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16330017
CURRENT_STATUS
02
SITE_LOCATION
1443 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\Tiered Permitting\N\NAVY\1443\PR0507023\COMPLIANCE INFO 1994 - 2018.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8.3. Any DTSC-approved workplan, report, specification, or schedule required <br /> under this Consent Agreement shall be deemed incorporated into this Consent <br /> Agreement. <br /> 8.4. Advice, suggestions, or comments given by DTSC representatives on <br /> anything other than official DTSC letterhead will not constitute an official approval or <br /> decision. <br /> SUBMITTALS <br /> 9.1. Beginning with the first full month following the effective date of this Consent <br /> Agreement, Respondent shall provide DTSC with quarterly progress reports of <br /> corrective action activities conducted pursuant to this Consent Agreement. Progress <br /> reports are due on the tenth day of the first month following the close of each reporting <br /> period. The progress reports shall conform to the Scope of Work for Progress Reports <br /> contained in Attachment 1. DTSC may adjust the frequency of progress reporting to be <br /> consistent with site-specific activities. <br /> 9.2. Any report or other document submitted by Respondent pursuant to this <br /> Consent Agreement shall be signed and certified by the project coordinator, a <br /> responsible corporate officer, or a duly authorized representative. <br /> 9.3. The certification required by paragraph 9.2 above, shall be in the following <br /> form: <br /> I certify that the information contained in or accompanying this submittal is <br /> true, accurate, and complete. As to those portions of this submittal for which <br /> I cannot personally verify the accuracy, I certify that this submittal and all <br /> attachments were prepared at my direction in accordance with procedures <br /> designed to assure that qualified personnel properly gathered and evaluated <br /> the information submitted. <br /> Signature: <br /> Name: <br /> Title: <br /> Date: <br /> 9.4. Respondent shall provide three (3) copies of all documents, including but <br /> not limited to, workplans, reports, and correspondence. Submittals specifically <br /> exempted from this copy requirement are all progress reports and correspondence of <br /> less than 15 pages, of which only one copy is required. <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.