Laserfiche WebLink
ATTACHMENT B <br /> SPILL PREVENTION CONTROL <br /> AND COUNTERMEASURE PLAN <br /> GENERAL INFORMATION <br /> FACILITY NAME _Stockton Terminal <br /> FACILITY OPERATOR ARCO Products Company <br /> FACIUTY LOCATION _ Stockton California <br /> DATE OF PREPARATION November. 1989 <br /> MANAGEMENT APPROVAL <br /> The following plan meets the requirements of the Spill Prevention Control and Counter- <br /> measure (SPCC) Plan, in accordance with Title 40 of the Code of Federal Regulations, <br /> Part 112, 'Oil Pollution Prevention", and will be implemented as herein described. <br /> SIGNATURE ��Q-� <br /> NAME p A. SHEARER <br /> I <br /> i <br /> TITLE Distribution Engineering Manager <br /> CERTIFICATION <br /> I hereby certify that I have examined the facility, and being familiar with the provisions of <br /> the Spill Prevention Control and Countermeasure Plan requirements, 40 CFR 112, attest <br /> that the SPCC P' _h been prepared in accordance with good engineering practices. <br /> o ROFssionq! <br /> o��S k�N Fye Eddie J. Rangel <br /> Printed Name of Registered <br /> No. 52 Professional Engineer <br /> (Seal) �Jt .OH <br /> A�OF CAUF�� 3 4n aft ur _ f Reg' Bred <br /> Professi al Engineer <br /> DATE California - 24522 <br /> �. State and Registration No. <br /> N <br /> t <br /> I <br />