My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2300 - Underground Storage Tank Program
>
PR0231094
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2021 9:11:52 AM
Creation date
7/31/2020 3:45:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231094
PE
2361
FACILITY_ID
FA0003632
FACILITY_NAME
AJS MINI MART INC
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95210
APN
07935016
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br />GPH =Gallons Per Hour, Y = Yes, N =No, NA= Not Applicable, VPH = VacuumlPressure,Mydrostatic, ID = Identification <br />..... ...... <br />MONITORING SYSTEM CERTIFICATION FORM (Page 5 of <br />6) <br />XII. LINE LEAK DETECTOR TESTING <br />❑ Check this box if line leak detectors (LLD) are NOT installed. (Do not complete this section.) <br />Y <br />N <br />NA <br />This section must be completed if LLDs are installed. <br />Was a leak simulated to verify LLD performance? <br />X <br />❑ <br />❑ <br />(Check all that apply.) Simulated leak rate verified: 0 3 GPH [10.1 GPH <br />❑ 0.2 GPH <br />Was the testing apparatus properly calibrated? <br />0 <br />❑ <br />❑ <br />For emergency generator tank systems, does the LLD create an audible and visual alarm when a leak is detected? <br />❑ <br />❑ <br />0 <br />For mechanical LLDs, does the LLD restrict the flow through the pipe when a leak is detected? <br />❑ <br />For electronic LLDs, does the turbine automatically shut off when a leak is detected? <br />Q <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br />❑X <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br />❑X <br />CEED <br />For electronic LLDs, have all accessible wiring connections been visually inspected for kinks and breaks? <br />X <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />Q <br />Were all LLDs confirmed operational within regulatory requirements? <br />Q <br />For any answer of "N" above, describe in Section Xlll how and when these issues were or will be corrected. <br />XIII. COMMENTS <br />XIV. VACUUM / PRESSURE / HYDROSTATIC MONITORING EQUIPMENT TESTING <br />❑X Check this box if VPH monitoring is NOT used. (Do not complete this section.) <br />This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br />System Type (Mark all that apply.) ❑ Vacuum ❑ Pressure ❑ Hydrostatic <br />Sensor Functionality <br />Interstitial Communication <br />Sensor ID <br />Component(S) Monitored By This Sensor <br />Test <br />Test <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />How was interstitial communication verified? ❑ Simulated Leak at Far Ends of the Interstitial Space <br />❑ Visual <br />Inspection <br />❑ Other (Describe the method in section XV below.) <br />❑ Gauge <br />Was the vacuum or pressure restored to operating levels in all interstitial spaces? <br />❑ <br />Yes <br />❑ <br />No (Describe <br />the reason in <br />section XV <br />below.) <br />For any answer of "Fail' above, describe in Section XV how and when these issues were or will <br />be corrected. <br />XV. COMMENTS <br />API <br />2019 <br />3 t -r <br />�a� 4 <br />, <br />�� 111`0 I <br />"I <br />_ <br />m <br />E E <br />. .� <br />a <br />f x ,k"%_ <br />_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.