Laserfiche WebLink
UNDERGROUND STORAGE TANK <br />MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) <br />XVI. MONITORING SITE PLAN <br />Date site map was prepared: 3/27/2019 <br />If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br />Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br />if installed: 1) monitoring system control panels; 2) in -tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br />annularspaces or vault; 4) devices monitoring product piping; 5) devices monitoring fillpiping; 6) devices monitoring ventpiping; 7) devices <br />monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under -dispenser containment, 10) <br />line leak detectors; and 11) devices monitoring any other secondary containment areas. <br />UST Monitoring Site Plan <br />Site Address I QAsIQ7906 N EI Dorado Stockton 95210 <br />\ x <br />r''ape' - �YA0.S1A •tP' )(N) <br />67. / <br />......................... _.... TL F <br />.I.._.... x x P <br />.. <br />KEY <br />A= AMNLTILAR <br />F = FILLS fPIPL\G = <br />T = TLTRBL` E GMOWS) <br />P = PROBE Draring of <br />V =VAPOR _ pipinz exit of <br />:X = STJNIP SENSOR sump and UDC's. <br />L=Leak Detector N d and <br />hI = hfanwas <br />B = Brine Sensor <br />I = Smart Sensor <br />S=STP <br />• o un ugro <br />- drananci <br />Cannotspecvlate <br />blue prints, <br />C=Floats�Clraias _ <br />. <br />Dale <br />EL <br />DORADO <br />L. <br />A <br />map was drawn0:127/19 <br />Instructions <br />If you already have a diagram Mats owsa0 required information. you may include 1, rather han this page, with your h{onitoring System C=_Rficatim. On your s to plan, <br />show the general layout of tanks and piping. Clearly iden* locations of the following equipment, if installed: mon1loring system control panels; sensors monitoring lank <br />annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas: mechanical or electronic line leak detectors; and in -tank liquid levet <br />probes (if used for leak detecton). In the space provided, note the date_ this Sit= Pian was prepared. <br />AXe1:1 <br />