Laserfiche WebLink
UNDERGROUND STORAGE TANK <br />SPILL CONTAINER TESTING REPORT FORM (Page 1 of 1) <br />Type of Action ❑ Installation Test ❑ Repair Test Z 12 Month Test <br />I. FACILITY INFORMATION <br />CERS ID Date of Spill Container Test <br />10181259 3/27/2019 <br />Business Name (Same as Facility Name or DBA -Doing Business As) <br />AJ's SINCLAIR MINI MART <br />Business Site Address City ZIP Code <br />7906 N. EL DORADO STREET STOCKTON, CA 95207 <br />Il. UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br />Name of UST Service Technician Performing the Test (Print as shown on the ICC Certification.) Phone # <br />ZANE NIMMO (209) 744-0112 <br />Contractor / Tank Tester License # ICC Certification # ICC Certification Expiration Date <br />04-1676 Ex. 3/31/19 8883064 -UT 6/1/2019 <br />Spill Container Testing Training and Certifications (List applicable certifications.) <br />Franklin Fueling - EBW & Phil Tite #10009843708 Ex. 11/29/2020 <br />OPW #104-632 Ex. 3/14/2020 <br />III. SPILL CONTAINER TESTING INFORMATION <br />Test Method Used: ❑x Manufacturer Guidelines (Specify): O P W PHASE I LAKE TESTING <br />❑ Industry Code or Engineering Standard (Specify): <br />❑ Engineered Method (Specify): <br />Attach the testing procedures and all documentation required to determine the results. # of Attached Pages <br />TANK ID: (By tank number, stored product, etc.) 1 - 87 OCT 12 - 87 SLAVE 3 - 87 SYPHON 4 - 91 OCT <br />Spill Container Manufacturer: O P W O P W O P W <br />Method of Cathodic Protection: ❑x Non -Metallic ❑x Non -Metallic ❑x Non -Metallic Z Non -Metallic <br />❑ Isolation ❑ Isolation ❑ Isolation ❑ Isolation <br />❑ Other (specify in V.) ❑ Other (Specifyin V) ❑ Other (Specifyin V.) ❑ Other (Specifyin V) <br />Inside Diameter of Spill Container: (Inches) 11 11 11 11 <br />Depth of Spill Container: (Inches) 13 13 13 13 <br />Does the spill container have a 5 gallon capacity? ❑x Yes ❑ No ❑x Yes ❑ No ❑x Yes ❑ No R Yes ❑ No <br />Method to Keep Spill Container Empty: ❑x Drain Valve ❑x Drain Valve ❑x Drain Valve ❑x Drain Valve <br />❑ Onsite Pump ❑ Onsite Pump ❑ Onsite Pump ❑ Onsite Pump <br />❑ Other (Specifyin V.) ❑ Other (Specifyin V.) ❑ Other (Specifyin V.) ❑ Other (Specifyin V) <br />IV. SUMMARY OF TESTING RESULTS <br />Spill Container Test Results: Z Pass ❑ Fail ❑x Pass ❑Fail Z Pass ❑Fail ❑x Pass ❑ Fail <br />V. COMMENTS <br />Any items marked "Fail" above must be explained in this section. Any additional comments may also be provided here. <br />ALL SPILLS CONTAINED IN FILL SUMPS W/ SENSORS I FALL BUCKETS MEASURED 5 GALLONS <br />VI. CERTIFICATION BY UST SERVICE TECHNICIAN CO TI, THI ,ITESTIN(3 j ,' <br />I hereby certify that the spill containers were tested in accordance with California Code of, -Regulations, Title 23, Division 3, <br />Chapter 16, Section 2637.1 and all the information contained herein is accurate. <br />UST Service Technician Signature W=j i <br />If the <br />facility has more components than this form accommodates, additional copies of this page maybe attached. <br />CERS = California Environmental Reporting System, ID =Identification, UST= Underground Storage Tank, ICC = International Code Counal <br />