My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_MONIT RPTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
401
>
4200 – Liquid Waste Program
>
PR0526172
>
ARCHIVED REPORTS_MONIT RPTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2020 7:43:29 PM
Creation date
8/5/2020 10:00:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200 – Liquid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
MONIT RPTS
RECORD_ID
PR0526172
PE
4242
FACILITY_ID
FA0017710
FACILITY_NAME
ANKA NORTHSTAR
STREET_NUMBER
401
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
MANTECA
Zip
95336
APN
24130052
CURRENT_STATUS
01
SITE_LOCATION
401 S AIRPORT WAY
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\4200 - Liquid Waste\A\AIRPORT WAY\401\PR0526172\MONIT RPTS.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orenco Systems Inc. March 2002 <br /> AdvanTex AX10 Test Report <br /> Table 1: AdvanTex"^ AX10 Dosage <br /> AX10 Plant AX10 Plant <br /> Dosage Dosage Dosage <br /> Period <br /> (/o d daily) (gallons) (gallons) <br /> — <br /> @ 500 gpd @ 400 gpd <br /> #1: 6:00 to 9:00 am 35 175 140 <br /> #2: 11:00 am to 2:00 pm 25 125 100 <br /> #3: 5:00 to 8:00 pm 40 200 160 <br /> 2.3 Stress Testing <br /> _ The NSF/ANSI Standard 40 protocol includes four stress scenarios (described in <br /> Appendix A), which were applied to the AdvanTexT"AX10 plant for each flow rate as <br /> described in Table 2. <br /> Table 2: Stress Testing Periods <br /> STRESS TEST @ 500 gpd @ 400 gpd <br /> Wash-Day Stress February 5th to 91h, 2001 September 10th to 14th <br /> Working-Parent Stress February 17'h to 21", 2001 September 22nd to 26'h <br /> Power Failure Stress March 1' to 3rd, 2001 October 4th to 61h <br /> Vacation Stress March 11th to 20`" , 2001 October 14th to 23`d <br /> 2.4 Colour, Odour, Oil and Foam <br /> 2.4.1 Colour <br /> Effluent samples were diluted 1000:1. Following dilution, colour was measured with a <br /> Hach DR2000 spectrophotometer using the Hach APHA Platinum-Cobalt Standard <br /> Method, adapted from APHA Standard Methods for the Examination of Water and <br /> Wastewater. <br /> The results are presented in Table 3. <br /> Nova Tec Consultants Inc. Page 11 of 38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.