My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_MONIT RPTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
401
>
4200 – Liquid Waste Program
>
PR0526172
>
ARCHIVED REPORTS_MONIT RPTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2020 7:43:29 PM
Creation date
8/5/2020 10:00:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200 – Liquid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
MONIT RPTS
RECORD_ID
PR0526172
PE
4242
FACILITY_ID
FA0017710
FACILITY_NAME
ANKA NORTHSTAR
STREET_NUMBER
401
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
MANTECA
Zip
95336
APN
24130052
CURRENT_STATUS
01
SITE_LOCATION
401 S AIRPORT WAY
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\4200 - Liquid Waste\A\AIRPORT WAY\401\PR0526172\MONIT RPTS.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orenco Systems Inc. March 2002 <br /> AdvanTex AX10 Test Report <br /> 2. ADVANTEXT11 - AX10 TEST <br /> Plant start-up and loading was carried out in accordance with the ANSI Standard 40 <br /> Protocol described in Appendix B. <br /> 2.1 Plant Start-up and Loading <br /> The AdvanTexTm AX10 system was installed under the supervision of Orenco staff on <br /> September 25`h, 2000. Following installation, the septic and recirculation chambers were <br /> successfully subjected to a hydrostatic test, involving filling the chambers with water to a <br /> depth of 53 and 3/8 inches, and verifying the depth had not changed after 72 hours. <br /> Plant start-up occurred on October 6th, 2000, at which time 1/3 of the water was removed <br /> and replaced with raw municipal sewage. Dosing, as described in Section 2.2, was then <br /> initiated, along with influent and effluent composite sampling. <br /> Data collected from October 15, 2000 (Day 1) to November 16, 2001 (Day 398) is <br /> presented in this report. <br /> 2.2 Plant Loading <br /> During the first 10 months of testing, the AdvanTexTm AX10 was fed 500 gpd (1,890 Ud)of <br /> raw sewage following the ANSI Standard 40 protocol as described in Appendix A. This <br /> flow rate was reduced to 400 gpd (1,515 Ud) on August 4, 2001 (Day 294 at the end of the <br /> 42nd week of testing) and was maintained at that rate for the remaining 3.5 months of <br /> testing. A computer controlled pneumatic gate-valve was regulated to deliver 5-gallon (19- <br /> Litre) doses each day over the three periods in accordance with the percent daily dosage <br /> — shown in Table 1 (i.e., 35 evenly distributed doses in period 1, 25 in period 2 and 40 in <br /> period 3). <br /> Dosage volumes are routinely verified and calibrated, and the daily effluent volumes are <br /> independently verified by monitoring the daily volume of effluent from the test unit. The 30- <br /> day average daily dosing volumes were within 10% (±) of the specified daily loading rate, <br /> — as per the NSF/ANSI Standard 40 protocol. <br /> Nova Tec Consultants Inc. Page 10 of 38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.