Laserfiche WebLink
Orenco Systems Inc. March 2002 <br /> AdvanTex AX 10 Test Report <br /> 4.6 Start Up <br /> The typical NSF/ANSI Standard 40 (three week) startup period was waived and within the <br /> first day of operation, the system CBODS removal was greater than 80%, with effluent TSS <br /> concentrations under 15 mg/L. <br /> NovaTec Consultants Inc. Page 27 of 38 <br />