My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005975
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1434
>
3500 - Local Oversight Program
>
PR0545950
>
ARCHIVED REPORTS_XR0005975
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2020 1:01:21 AM
Creation date
8/6/2020 10:50:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005975
RECORD_ID
PR0545950
PE
3528
FACILITY_ID
FA0003739
FACILITY_NAME
Colonial Energy CE 40134 (DBA Power Mart)
STREET_NUMBER
1434
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95337
CURRENT_STATUS
02
SITE_LOCATION
1434 W Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SF 4COR <br /> STANDARD SAFETY DRILLING SAFETY SSP 30 <br /> PROCEDURES APPENDIX A <br /> H. ELECTRICITY AND POWER TOOLS <br /> 1. Is low voltage equipment used in tanks and wet areas? <br /> Comments <br /> 2. Are tools maintained, inspected and in good condition? <br /> Comments: <br /> 3 Are electrical tools and instruments approved for use in hazardous areas? <br /> If yes, good for CIass , Division , Groups <br /> Comments: R <br /> 4. <br /> Is the insulation on cords in good condition and plugs unbroken <br /> Comments- <br /> 5. Are extension and power cords properly <br /> grounded <br /> Comments: <br /> 6. Has the grounding prong on any three prong plug been cut off? If not, is the <br /> extension cord made for a ground plug9_ <br /> Comments: <br /> 7. Are guards in place on portable electric tools'? <br /> Comments <br /> I. S DURING SETUP AND DRILLING <br /> corp-h&slssp-30 30-A-10 REVISED 11/02/92 <br />
The URL can be used to link to this page
Your browser does not support the video tag.