Laserfiche WebLink
SEACOR <br /> STANDARD SAFETY DRILLING SAFETY SSP 30 <br /> PROCEDURES APPENDIX A <br /> 1. is bannerguard used to delineate the area around the rig (standard is one <br /> mast/derrick length)9 <br /> Comments: <br /> 2 is the mast/derrick lowered when the rig is moved from one place to another's <br /> Comments: <br /> 3 Have overhead and buried utilities been located and marked before drilling <br /> begins <br /> Comments• <br /> 4. Are all personnel (except drillers) cleared from the rear of and the sides of the rig <br /> when the avast/derrick is being raised? <br /> Comments- <br /> 5. Are the jack pods lowered and leveled before the mast/derrick is raised or <br /> lowered <br /> Comments• <br /> 6. Before drilling begins, is the mast/derrick locked into place? <br /> Comments <br /> 7 Does the driller shut down the operation of the rig when he is not at the <br /> controls <br /> Comments. <br /> corp-h&slssp-30 30--A-11 REVISED 11/02/92 <br />