My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005975
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1434
>
3500 - Local Oversight Program
>
PR0545950
>
ARCHIVED REPORTS_XR0005975
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2020 1:01:21 AM
Creation date
8/6/2020 10:50:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005975
RECORD_ID
PR0545950
PE
3528
FACILITY_ID
FA0003739
FACILITY_NAME
Colonial Energy CE 40134 (DBA Power Mart)
STREET_NUMBER
1434
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95337
CURRENT_STATUS
02
SITE_LOCATION
1434 W Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEACOR <br /> STANDARD SAFE'T'Y DRILLING SAFE'T'Y SSP 30 <br /> PROCEDURES APPENDIX A <br /> 8. Are open holes covered when left unattended? <br /> Comments- <br /> 9. Are drillers restricted from climbing the mast/derrick? If not, do they use <br /> safety belts or harnesses9 <br /> Comments: <br /> 10. Are all drilling operations shut down and workers required to be in safe locations <br /> during electrical storms`' <br /> Comments: <br /> 11. Are drillers aware that the mast/derrick must be a minimum of 20 feet from <br /> overhead power lines? _ <br /> Comments• -- ---- ---- ------ — ---- - -- -�-- — - - - -- <br /> 12. Have underground utility, surveys been performedm before drilling at each <br /> Iocation9 <br /> Comments. <br /> 13. If drilling is allowed after dusk, are five foot-candles of light provided? <br /> Comments <br /> 14. Is the entire drilling area illuminated so that personnel may see the hazards9 <br /> Comments <br /> i <br /> NOTE: Drilling after dusk is not recommended. CAR HEADLIGHTS ARE NOT AN <br /> ACCEPTABLE MEANS OF ILLUMINATION. <br /> corp-h&slssp-30 30-A-12 REVISED 11/02/92 <br />
The URL can be used to link to this page
Your browser does not support the video tag.