Laserfiche WebLink
Site Characterization Work Plan <br /> ABF Freight System,Inc <br /> Manteca,California Page ii <br /> TABLE OF CONTENTS <br /> Page <br /> 1.0 INTRODUCTION..................................................................................................................1 <br /> 1 1 Purpose and Project Scope 1 <br /> 12 Plan Organization 1 <br /> 2.0 SITE DESCRIPTION AND BACKGROUND....................................................................2 <br /> 3.0 REGULATORY REQUIREMENTS AND PERMITS......................................................3 <br /> 31 Federal Regulations 3 <br /> 3 1 1 UST Closure 3 <br /> 3 12 Identification of Hazardous Materials 4 <br /> 3 1 3 Transportation and Disposal 4 <br /> 3 2 State of California Regulations 4 <br /> 3 3 Local Requirements 4 <br /> 4.0 PROJECT STAFFING..........................................................................................................4 <br /> 4 1 Project Organization 5 <br /> 4 1 1 Project Manager/Site Superintendent - Steve Essert 5 <br /> 4 12 Laboratory Quality Assurance Officer—Mr John Murphy 5 <br /> 4 2 Subcontractors 5 <br /> 5.0 FIELD ACTIVITIES.............................................................................................................6 <br /> 5 1 Introduction 6 <br /> 52 Regulatory File Review and Receptor Survey 6 <br /> 53 Underground Utility Clearance 6 <br /> 54 Soil and Groundwater Sampling Program 6 <br /> 55 Monitoring Well Construction 7 <br /> 56 Monitoring Well Development and Sampling 7 <br /> 57 Water Level Measurements and Well Sampling 8 <br /> 58 Grouting and Waste Materials 8 <br /> 59 Report Preparation 8 <br /> LIST OF APPENDIX <br /> APPENDIX I SITE DRAWINGS <br /> APPENDIX 2 SITE SAFETY AND HEALTH PLAN <br /> APPENDIX 3 UST UNAUTHORIZED RELEASE REPORT <br /> APPENDIX 4 UST CLOSURE REPORT <br /> • <br /> 11SERVERIK-DRIVEIPROJECTS\32721Plans and Reports\ABF Final Site Characterization Work Plan doc <br /> 612319$ <br />