Laserfiche WebLink
Site Characterization Work Plan <br /> ABF Freight System,Inc. <br /> Manteca,California Page I <br /> • 1.0 INTRODUCTION <br /> This document presents CAL INC's proposed scope of work for assessing the vertical and lateral <br /> extent of diesel contamination in soil and groundwater associated with a former 10,000 gallon <br /> diesel UST located at the site A background section and the scope of work for the site <br /> investigation are presented in the following sections <br /> 1.1 Purpose and Project Scope <br /> The scope of work for the site investigation includes conducting a soil and groundwater sampling <br /> program designed to assess the vertical and lateral extent of diesel contamination in soil and <br /> groundwater associated with the former 10,000 gallon diesel UST <br /> This document presents a description of the methodologies that will be utilized during the site <br /> investigation This document and the accompanying appendices were developed to meet all <br /> planning requirements In summary, the contract work will include <br /> 1 Regulatory file review, <br /> 2 Potential receptor survey; <br /> 3 Conducting an underground utility clearance, <br /> 4 The drilling, installation, and development of four monitoring wells, <br /> 5 The collection and analysis of soil and groundwater samples form each well, <br /> 6 Surveying the top of casing elevation of each well and the collection of groundwater <br /> elevation measurements to determine the depth and direction of groundwater flow, and <br /> 7 Preparation of report summarizing findings and recommendations <br /> 1.2 Plans Organization <br /> This workplan is organized into several sections, each of which describes a specific aspect of the <br /> project In general, the workplan is organized as follows <br /> Section IINTRODUCTION This section provides a brief introduction to the workplan, including <br /> the purpose and scope of the project, and this outline <br /> Section 2 REGULATORY REQUIREMENTSAND PERMITS This section identifies the federal, <br /> state, and local regulations applicable to the project <br /> Section 3 PROJECT STAFFING This section identifies key personnel involved with the project, <br /> and outlines each persons specific project responsibilities <br /> 1L5ERVERIIC-DRIVEIPROIECTS132721Plans and Reports\ABF Final Site Charactenzation Work Plan doc <br /> 6123198 <br />