My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003573
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
2427
>
3500 - Local Oversight Program
>
PR0545952
>
ARCHIVED REPORTS_XR0003573
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 5:25:11 AM
Creation date
8/6/2020 11:46:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003573
RECORD_ID
PR0545952
PE
3528
FACILITY_ID
FA0003495
FACILITY_NAME
ABF FREIGHT SYSTEMS INC
STREET_NUMBER
2427
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
19817006
CURRENT_STATUS
02
SITE_LOCATION
2427 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Safety and Health Plan <br /> Site Contamination Work Plan,ABF Freight Systems,Inc <br /> 2427 West Yosemite Avenue,Manteca,California F Freight System,Inc <br /> Manteca,California Page 19 <br /> • Designate at least one vehicle for emergency use <br /> • If toilet facilities are not located within a 5-minute walk from the decontamination facilities, <br /> either provide a chemical toilet and hand washing facilities or have a vehicle available (not <br /> the emergency vehicle) for transport to nearby facilities <br /> • Prior to working on-site, inspect the site for hazards (I a chemicals, spiders, electrical <br /> hazards) <br /> • Conduct or review utility clearance prior to start of work, if appropriate <br /> 5 9 2 General Daily Operating Procedures <br /> • Document any procedural changes made from that specified In the SSHP and ensure these <br /> procedural change descriptions/explanations are forwarded to the PM and project file <br /> • Hold dally Tailgate Safety Meetings prior to work start Document Tailgate Safety Meetings <br /> at the beginning of a project and/or when commencing new job tasks in new areas <br /> . • Use monitoring Instruments and follow designated action levels specified in Sections 5 4 and <br /> 5 5 and Table 5-2 <br /> • Use personal protective equipment (PPE) as specified in Section 5 3 and Table 5-1 <br /> • Try to remain upwind of operation <br /> • Vent wells from an upwind position <br /> • No work will be conducted without adequate natural light or without appropriate supervision <br /> • Dust control measures may be needed on roads that cross the exclusion zone <br /> • Spoils from dulling work should be placed so as not to be in the expected paths of travel <br /> • DnIling cuttings should be kept shoveled up and drummed, out of the way of workers <br /> Liquids generated during drilling should be contained out of the way to limit the amount of <br /> mud created around the rig <br /> • Care should be taken to hmit the extent that a piece of equipment comes into contact with <br /> contamination (e g , on backhoes, limit contact to the arm and bucket) <br />• A work/rest regime will be initiated when ambient temperatures <br /> ' and protective clothing <br /> N IPROJECTS02721P1ans and Reports\Dnllmg SSHP 2 doe May G, 1998 <br />
The URL can be used to link to this page
Your browser does not support the video tag.