Laserfiche WebLink
Site Safety and Health Plan <br /> Site Contamination Work Plan,ABF Freight Systems,Inc <br /> 2427 West Yosemite Avenue,Manteca,California F Freight System,Inc <br /> . Manteca,California Page 20 <br /> create a potential heat stress situation <br /> • Heat Stress Recommended Work/Rest Regime <br /> • If ambient temperatures exceed 75F, the following work/rest regime is recommended <br /> Temperature Work Rest <br /> 75 - 80 90 min 15 min <br /> 80 - 85 60 min 15 min <br /> 85 - 90 45 min 15 mm <br /> 90 - 95 30 min 15 min <br /> *Rest in a shaded area <br /> At least 8 ounces of cool water, Gatorade, or diluted fruit Juice must be consumed at each <br /> rest break Guidelines assume light to moderate work and may need to be modified <br /> further based on the level of PPE worn <br /> • 5 9 3 Personnel Operating,Procedures <br /> • Do not walk through areas of obvious or known contamination <br /> • Do not handle or touch contaminated materials directly <br /> • Make sure all PPE has no cuts or tears prior to donning <br /> • Inspect the integrity of the PPE regularly <br /> • Fasten all closures on suits, covering with tape if necessary <br /> • Take particular care to protect any existing skin injuries <br /> • Stay upwind of airborne contaminants <br /> • Do not carry cigarettes, gum, etc into contaminated areas <br /> • Refer to Site Safety Officer for specific concerns for each individual site task Do not climb <br /> over/under drums, or other obstacles and always employ the buddy system <br /> • Practice contamination avoidance, on- and off-site Activities should be planned ahead of <br /> • time <br /> • Apply immediate first aid to any and all cuts, scratches, abrasions, etc <br /> N 1PROJECTS132721P1ans and Reports\Dnlhng SSHP 2 doc May 6, 1998 <br />