Laserfiche WebLink
Site Safety and Health Plan <br /> Site Contamination Work Plan,ABF Freight Systems,Inc <br /> 2427 West Yosemite Avenue,Manteca,California F Freight System,Inc <br /> . Manteca, California Page 22 <br /> personnel and equipment resources for response <br /> Step 3 Notify the Site Safety Officer and/or Field Supervisor <br /> Step 4 As appropriate, evacuate site personnel and nearby public and contain <br /> hazards <br /> Step 5 Consult the posted emergency phone list and contact key project personnel <br /> Step 6 Prepare an incident report Forward incident report to Project Manager/Health <br /> and Safety Manager within 24 hours <br /> 612 Injury <br /> If an injury occurs, take the following action <br /> Step 1 Assess the severity of the injury and perform life-saving first aid/CPR as <br /> necessary (and able) to stabilize the injured person <br /> Step 2 Get medical attention for the injured person immediately (Call 911 or consult <br /> . Personnel and Services Phone List- Table 1-1) <br /> Step 3 Notify the Site Safety Officer and Field Supervisor immediately The Site <br /> Safety Officer will assume charge during a medical emergency <br /> Step 4 Depending on the type and seventy of the injury, notify the Corporate <br /> Consulting Physician or the occupational physician for the injured person <br /> Step 5 Notify the injured person's personnel office, including the Regional Manager, <br /> Project Manager, and Health and Safety Manager <br /> Step 6 Prepare an accident report The Site Safety Officer is responsible for its <br /> preparation and submittal to the Health and Safety Manager (HSM) <br /> 6 1 3 Site-Specific Procedure <br /> None <br /> 6.2 Emergency Routes <br /> See Hospital Route Map - Attachment 5 <br />• <br /> N 1PROJECTSl32721P1ans and ReportslDnlling SSHP 2 doc May G, 1998 <br />