My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003573
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
2427
>
3500 - Local Oversight Program
>
PR0545952
>
ARCHIVED REPORTS_XR0003573
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 5:25:11 AM
Creation date
8/6/2020 11:46:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003573
RECORD_ID
PR0545952
PE
3528
FACILITY_ID
FA0003495
FACILITY_NAME
ABF FREIGHT SYSTEMS INC
STREET_NUMBER
2427
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
19817006
CURRENT_STATUS
02
SITE_LOCATION
2427 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Safety and Health Plan <br /> Site Contamination Work Pian,ABF Freight Systems,Inc <br /> 2427 West Yosemite Avenue,Manteca,California F Freight System,Inc <br /> • Manteca,California Page 21 <br /> • Report all accidents, no matter how minor, to the SSHO <br /> • Be alerted to your own physical condition Watch your buddy for signs of fatigue, exposure, <br /> etc <br /> 5 9 4 Additional Site-Specific Operating.Procedures <br /> Be aware of truck traffic into and out of freight yard <br /> 5.10 Weekly Safety Meetings <br /> Weekly health and safety training/discussion meetings will be held The SSHO will be for <br /> scheduling and conducting this safety meeting All on-site personnel will be required to attend <br /> Hands-on refresher training on PPE, decontamination procedures, work practices, changes in <br /> work-tasks, schedule changes, results of previous week's air monitoring, review of safety <br /> discrepancies noted during previous week, etc , will be discussed Should an operation change <br /> affecting the on-site field work be made, a meeting prior to implementation of the change will be <br /> convened to explain the changes to all concerned <br /> 6.0 CONTINGENCY PLAN <br /> The nature of work at contaminated or potentially contaminated work sites makes emergencies a <br /> continual possibility Although emergencies are unlikely and occur infrequently, a contingency <br /> plan is required to assure timely and appropriate response actions The contingency plan is <br /> reviewed at tailgate safety meetings <br /> Tailgate Safety Meetings are required in order to fulfill regulatory provisions for training <br /> employees on site-specific hazards as a means of minimizing work-place injuries and illnesses <br /> Prior to commencing work on a site, a Tailgate Safety Meeting will be conducted to review site- <br /> specific hazards and protocols <br /> The following sections outline emergency procedures and routes <br /> 6.1 Emergency Procedures ocedures <br /> 6 1 1 Incident 1 1 <br /> If an emergency incident occurs, take the following action <br /> Step 1 Size-up the situation based on the available information <br /> Step 2 As necessary, request assistance from outside sources and/or allocate <br /> N IPROJECTS132721P1ans and Reports\Dnlling SSI IP 2 doe May 6, 1998 <br />
The URL can be used to link to this page
Your browser does not support the video tag.