Laserfiche WebLink
PRIVATE CIVIL ENGINEER'S EROSION CONTROL LIST OF MAJOR CONSTRUCTION MATERIALS, LIST OF BEST MANAGEMENT PRACTICES (BIVIP's)-USE AS APPLICABLE <br /> BMP LEGEND PLAN GENERAL NOTES WASTE AND ACTIVITIES AT THE PROJECT SITE (REFERENCE: CALIFORNIA STORM WATER BEST MANAGEMENT PRACTICE HANDBOOK FOR CONSTRUCTION <br /> INSTALL STRAW WATTLES BARRIER PER CONSTRUCTION NOTE (f�D AND DETAIL 1. THIS EROSION CONTROL PLAN WAS PREPARED AT THE REQUEST OF IN-N-OUT BURGER, 1. CONCRETE PAVEMENT. ACTIVITY, NOVEMBER 2009) <br /> "Y" SHOWN HEREON. DEVELOPER OF THE PROPERTY BEING DEVELOPED AT THE LATHROP MARKETPLACE 2. CONCRETE CURBS AND WALKS. NON-STORMWATER MANAGEMENT AND <br /> SHOPPING CENTER PAD "J", LOCATED AT 16514 GOLDEN VALLEY, IN THE CITY OF EROSION AND SEDIMENT CONTROL BIMP's MATERIAL MANAGEMENT(BIMP's) <br /> INSTALL GRAVEL BAG BERM PER SE-6 AND PER DETAIL 'Y' SHOWN HEREON. LATHROP, IN SAN JOAQUIN COUNTY, CALIFORNIA. THE PROPOSED CONSTRUCTION 3. COVERED TRASH ENCLOSURE. <br /> ACTIVITY INCLUDES CONSTRUCTION OF A NEW IN-N-OUT BURGER BUILDING AND EC-1 SCHEDULING NS-1 WATER CONSERVATION PRACTICES <br /> ICLE STAGING, STORAGE, CLEANING, FUELING AND MAINTENANCE PER PARKING LOT WITH A TOTAL OF 1.4 ACRES OF TOTAL AREA CONSTRUCTED/GRADED 4. UTILITY SERVICES TO PROPOSED BUILDING AND COVERED TRASH EC-2 PRESERVATION OF EXISTING VEGETATION NS-2 DEWATERING OPERATIONS <br /> BMP's NS-8, NS-9 AND NS-10; CONSTRUCTION MATERIAL DELIVERY AND ONSITE. ENCLOSURE. EC-3 HYDRAULIC MULCH NS-3 PAVING AND GRINDING OPERATIONS <br /> EC-4 HYDROSEEDING NS-4 TEMPORARY STREAM CROSSING <br /> STORAGE PER BMP's WM-1, WM-2 AND WM-4; AND WASTE MANAGEMENT 2. THE EROSION CONTROL PLAN AND THE STORMWATER POLLUTION PREVENTION PLAN 5. PARKING LOT LIGHTS. EC-5 SOIL BINDERS NS-5 CLEAR WATER DIVERSION <br /> PER BMP'S WM-5, WM-8 AND WM-9. (SWPPP) SHALL BE KEPT ON SITE DURING CONSTRUCTION ACTIVITY. THE APPLICABLE EC-6 STRAW MULCH NS-6 ILLICIT CONNECTION/DISCHARGE <br /> BMP'S (BEST MANAGEMENT PRACTICE) LISTED ON THIS PLAN AND WITHIN THE SWPPP 6. LANDSCAPING AND IRRIGATION. EC-7 GEOTEXTILES AND MATS NS-7 POTABLE WATER/IRRIGATION <br /> PORARY ROCK AT A STABILIZED CONSTRUCTION ENTRANCE/EXIT WITH SHALL BE IMPLEMENTED AS SOON AS POSSIBLE TO CONTROL STORM WATER POLLUTION EC-8 WOOD MULCHING NS-8 VEHICLE AND EQUIPMENT CLEANING <br /> CORRUGATED STEEL PANELS PER BMP TC-1 MODIFIED TO FIT SITE DURING CONSTRUCTION. 7. STORM DRAIN PIPE AND DRAIN BOX INLETS. EC-9 EARTH DIKES AND DRAINAGE SWALES NS-9 VEHICLE AND EQUIPMENT FUELING <br /> 'IONS. EC-10 VELOCITY DISSIPATION DEVICES NS-10 VEHICLE AND EQUIPMENT MAINTENANCE <br /> 3. THROUGHOUT THE DURATION OF CONSTRUCTION, THE CONTRACTOR SHALL HAVE A 8. ASPHALT PAVEMENT. EC-11 SLOPE DRAINS NS-11 PILE DRIVING OPERATIONS <br /> STATE CERTIFIED QUALIFIED SWPPP DEVELOPER (QSD) ASSIGNED TO THE PROJECT IN EC-12 STREAMBANK STABILIZATION NS-12 CONCRETE CURING <br /> ACCORDANCE WITH SECTION VII OF THE NATIONAL POLLUTANT DISCHARGE ELIMINATION 9. EARTHWORK MOVED AND GRADED. EC-13 POLYACRYLAMIDE NS-13 CONCRETE FINISHING <br /> SYSTEM (NPDES) GENERAL PERMIT FOR STORM WATER DISCHARGES ASSOCIATED WITH SE-1 SILT FENCE NS-14 MATERIAL AND EQUIPMENT USE <br /> CONSTRUCTION AND LAND DISTURBANCE ACTIVITY (CONSTRUCTION GENERAL PERMIT). 10. OUTDOOR SEATING CANOPY. SE-2 SEDIMENT BASIN NS-15 DEMOLITION ADJACENT TO WATER <br /> ADJACENT ROLLS SHALL THE QSD IS RESPONSIBLE FOR ALL CHANGES TO THE PROJECT SWPPP AND EROSION SE-3 SEDIMENT TRAP NS-16 TEMPORARY BATCH PLANTS <br /> TIGHTLY ABUT. DO NOT CONTROL PLAN. 11. CONSTRUCTION OF A NEW BUILDING. SE-4 CHECK DAM WM-1 MATERIAL DELIVERY AND STORAGE <br /> OVERLAP ENDS. SE-5 FIBER ROLLS (ED(D<ED (SEE BMP WM-2 MATERIAL USE <br /> 4. THROUGHOUT THE DURATION OF CONSTRUCTION, THE CONTRACTOR SHALL HAVE A LEGEND HEREON) WM-3 STOCKPILE MANAGEMENT <br /> PLACE EXCAVATED TRENCH SOIL STATE CERTIFIED QUALIFIED SWPPP PRACTITIONER (QSP) ASSIGNED TO THE PROJECT IN SE-6 GRAVEL BAG BERM WM-4 SPILL PREVENTION AND CONTROL <br /> ON THE UPHILL OR FLOW SIDE OF ACCORDANCE WITH SECTION VII OF THE CONSTRUCTION GENERAL PERMIT (CGP). THE SE-7 STREET SWEEPING AND VACUUMING WM-5 SOLID WASTE MANAGEMENT <br /> THE WATTLE TO PREVENT WATER Ix QSP IS RESPONSIBLE FOR IMPLEMENTATION OF ALL ASPECTS OF THE EROSION CONTROL CONSTRUCT CONTINUOUS 3-BAG SE-8 SANDBAG BARRIER WM-6 HAZARDOUS WASTE MANAGEMENT <br /> FROM FLOWING UNDER THE WATTLE HIGH GRAVEL BAG BARRIER EXCEPT SE-9 STRAW BALE BARRIER WM-7 CONTAMINATED SOIL MANAGEMENT <br /> PLAN, THE STORMWATER POLLUTION PREVENTION PLAN (SWPPP) AND THE SWPPP FOR 2-BAG TALL AT FLOW SE-10 STORM DRAIN INLET PROTECTION WM-8 CONCRETE WASTE MANAGEMENT <br /> SPECIFICATIONS. LOCATION ENTERING THE INLET <br /> WE-1 WIND EROSION CONTROL WM-9 SANITARY/SEPTIC WASTE MANAGEMENT <br /> 8" TO 10" 1\ TC-1 STABILIZED CONSTRUCTION ENTRANCE/EXIT WM-10 LIQUID WASTE MANAGEMENT <br /> DIAMETER 5. THE QSP OR PERSONNEL TRAINED BY THE QSP ARE RESPONSIBLE FOR PROVIDING TC-2 STABILIZED CONSTRUCTION ROADWAY <br /> 2" TO 4" WEEKLY, QUARTERLY, PRE-STORM, DURING STORM AND POST STORM BMP INSPECTIONS TC-3 ENTRANCE/OUTLET TIRE WASH <br /> TRENCH IN ACCORDANCE TO THE SWPPP. ALL INSPECTION RECORDS SHALL BE KEPT ONSITE <br /> FOR THE DURATION OF THE PROJECT. <br /> 3/4"x3/4"xl E3'!-`__ 6. ALL CONTRACTORS AND THEIR PERSONNEL WHOSE WORK CAN CONTRIBUTE TO OR <br /> WOOD STAKE _=TJ CAUSE STORM WATER POLLUTION SHOULD BE MADE FAMILIAR WITH THIS PLAN AND THE <br /> 4' ON CENTER SWPPP. ADEQUATE TRAINING FOR THE IMPLEMENTATION OF THE MEASURES PRESENTED <br /> HEREIN SHALL BE PROVIDED BY THE CONTRACTORS FOR THEIR PERSONNEL. - STORM CONSTRUCT CONTINUOUS SLOPEGARD <br /> - DRAIN 3 WEIGHTED FIBER ROLL BARRIER <br /> STRAW ROLLS MUST BE PLACED ALONG SLOPE 7. CHANGES IN CONSTRUCTION OR IN CONDITIONS WHICH ARE NOT COVERED BY THIS INLET 10, PER BMP LEGEND HEREON OR <br /> CONTOURS AND IN A 2" TO 4" TRENCH PLAN SHOULD BE BROUGHT TO THE ATTENTION OF THE QSD. IF NECESSARY THIS COVERED TYPICAL GRAVEL FILLED BURLAP BAGS <br /> SPECIFICATION: PLAN WILL BE REVISED TO REFLECT THE CHANGES. WITH FILTER OF SLOPED <br /> "SOCK" GRAVEL <br /> STRAW WATTLES SHALL BE MANUFACTURED FROM 8. ALL PREVENTION AND CLEAN UP MEASURES SHALL BE CONDUCTED IN ACCORDANCE ROCK <br /> RICE STRAW AND SHALL BE WRAPPED IN A TUBULAR WITH COUNTY ORDINANCES, AS WELL AS STATE, AND FEDERAL REGULATIONS. WASTE 711 111111 P <br /> BLACK PLASTIC NETTING. THE NETTING SHALL HAVE MATERIALS SHOULD BE DISPOSED OF IN A LEGAL MANNER. <br /> A STRAND THICKNESS OF 0.30 INCH, A KNOT <br /> THICKNESS OF 0.055, AND A WEIGHT OF 0.35 OUNCE 9. ONLY STORM WATER FROM THE PROJECT SITE SHALL BE ALLOWED TO FLOW INTO THE <br /> PER FOOT (EACH PLUS/MINUS 10%) AND SHALL BE PUBLIC STORM DRAIN SYSTEM. REGULAR INSPECTION OF THE STRUCTURAL AND <br /> NON-STRUCTURAL BEST MANAGEMENT PRACTICES USED ON THIS PROJECT SHALL BE <br /> MADE FROM 85% HIGH DENSITY POLYETHYLENE, 14% PERFORMED IN CONFORMANCE WITH THE SWPPP TO INSURE PROPER OPERATION. AREA PROVIDED FOR- <br /> ETHYL VINYL ACETATE AND 1% COLOR FOR UV <br /> INHIBITION. STRAW WATTLES SHALL BE NINE INCHES CONCRETE WASHOUT <br /> IN DIAMETER (PLUS OR MINUS ONE INCH), LOCAL DISTRIBUTOR: 10. ON A DAILY BASIS, AS-NECESSARY, AND AFTER CONSTRUCTION HAS BEEN COMPLETED, DRAINAGE INLET AREA LINED WITH 10 MIL <br /> THE SITE HARDSCAPE AND ADJOINING STREETS AND SIDEWALKS SHALL BE SWEPT PLASTIC '00 <br /> TWENTY-FIVE FEET LONG (PLUS OR MINUS 0.5 FEET) HYDRO-SCAPE CUSTOMER CLEAN. ALL WASTE AND LEFTOVER MATERIALS SHALL BE REMOVED FROM THE SITE. <br /> AND WEIGH 35 LBS. (PLUS OR MINUS 10%). SERVICE (800) 395-4477 ALL LANDSCAPING AND PLANTING AREAS SHALL BE WELL MAINTAINED TO PREVENT GRAVEL FILLED BURLAP BAGS (LAY EACH <br /> EROSION. AVOID OVERWATERING. LAYER IN OPPOSITE DIRECTIONS) <br /> _114" MIN. FOR 3 BAG <br /> 11. DISTURBED SOILS SHALL BE WATERED AS OFTEN AS NECESSARY TO KEEP SOIL VISIBLY HIGH BERM <br /> . 77joo,- n<:�� L <br /> DETAIL "Y" DAMP DURING GRADING AND CONSTRUCTION TO MINIMIZE DUST GENERATION. COMPLY GROUND 0 0 <br /> 00 00tio 0 T__T <br /> WITH AQMD RULE 403 TO INSURE THE CLEANUP OF CONSTRUCTION RELATED DIRT ON 00 0 0 e <br /> STRAW WA17LES BARRIER DETAIL OPTION SURFACE) 0 <br /> 00 00 b <br /> NOT TO SCALE APPROACH ROUTES TO THE SITE. 0 0 0 8' MINIM <br /> 12. AFTER A RAINSTORM, ALL SILT AND DEBRIS SHALL BE REMOVED FROM GRAVEL BAG <br /> BARRIERS. L 4" EMBEDMENT DETAIL "W" <br /> 13. PAUL KOSHMIDER, IN-N-OUT BURGER DIRECTOR OF NEW CONSTRUCTION (UNTIL A QSP 10' TYPICAL 1� <br /> HIRED BY THE GENERAL CONTRACTOR HAS BEEN ASSIGNED) SHALL BE NOTIFIED AT GRAVEL BAG BARRIER CONCRETE WASHOUT AREA <br /> (626) 905-1016 IN AN EMERGENCY. NOT TO SCALE <br /> 14. THE QSP SHALL PREPARE AN ANNUAL REPORT FOR EACH REPORTING PERIOD FROM DETAIL 'X & ----i <br /> JULY 1st TO JUNE 30th. THE ANNUAL REPORT SHALL INCLUDE STORMWATER STORM INLET GRAVEL BAG <br /> MONITORING INFORMATION AND DOCUMENTATION OF ALL TRAINING AND BMP <br /> INSPECTIONS. PROTECTION DETAIL AND BARRIER DETAIL OPTION <br /> Stabilized Construction Entrance/Exit TC-1 15. WITHIN 90 DAYS OF THE FINAL COMPLETION OF CONSTRUCTION THE QSP SHALL NOT TO SCALE <br /> ELECTRONICALLY FILE A NOTICE OF TERMINATION (NOT) THROUGH SMARTS AND UPLOAD <br /> Crushed aggregate greater than A FINAL SITE MAP AND PHOTOS. ADDITIONALLY THE QSP SHALL UPLOAD THE FINAL <br /> 3" but smaller than 6" ANNUAL REPORT. <br /> Filter fabric Original 16. 1 DO HEREBY CERTIFY UNDER PENALTY OF LAW THAT THIS DOCUMENT AND ALL <br /> 0 0 grade ATTACHMENTS WILL BE CARRIED OUT UNDER MY DIRECTION AND SUPERVISION. I <br /> UNDERSTAND THAT AT THE CONCLUSION OF THIS PROJECT, I WILL BE REQUIRED TO <br /> 12" Min, unless otherwise SUBMIT CERTIFICATION THAT ALL ELEMENTS OF THIS PROJECT WERE CARRIED OUT IN <br /> specified by a soils engineer ACCORDANCE WITH THIS EROSION CONTROL PLAN AND ALL OF ITS ATTACHMENTS. <br /> SECTION B-B PAUL KOSHMIDER, IN-N-OUT BURGER DIRECTOR OF NEW CONSTRUCTION 10-25-18 <br /> NOT TO SCALE DATE <br /> Crushed aggregate greater than PROJECT N.P.D.E.S. COORDINATOR (626) 905-1016 <br /> 3" but smaller than 6" TELEPHONE NUMBER <br /> Corrugated steel panels <br /> Original <br /> grade EROSION CONTROL PLAN CONSTRUCTION NOTES <br /> 12" Min, unles otherwise INSTALL GRAVEL BAG BARRIER PER DETAIL 'Y' SHOWN HEREON AND PER BMP SE-6. <br /> specified by a soils engineer Filter fabric WHEN THIS BARRIER IS INSTALLED AROUND A DRAIN BOX, STORM DRAIN, OR CATCH <br /> BASIN INLET, INSTALL A PERMEABLE FILTER FABRIC ON TOP OF THE INLET TO <br /> SECTION A-A PREVENT SILT FROM ENTERING THE INLET. <br /> NOT TO SCALE INSTALL BMP SE-5 STRAW WATTLES FIBER ROLL BARRIER PER DETAIL "Y" SHOWN <br /> HEREON AS AN ACCEPTABLE SUBSTITUTION TO THE SLOPEGARD MATERIAL CALLED <br /> NOTE: OUT TO INSTALL ON THIS PLAN. <br /> Construct sediment barrier <br /> and channelize runoff to Sediment trapping <br /> sediment trapping device device <br /> < <br /> -Corrugated steel panels <br /> < A <br /> 0 '00 <br /> :;166b 6 min or as required <br /> 0 W6 <br /> ON to accomodate <br /> - )90?Oc� <br /> anticipated traffic, <br /> < <br /> .0ag' . C D) whichever is greater. <br /> A% <br /> &:)Ow <br /> C C A��6� Jis greater. <br /> 0 <br /> z <br /> Dc 24' min. J <br /> X <br /> 50' min. <br /> or four times the circumference <br /> of the largest construction vehicle tire, <br /> Match whichever is greater <br /> Existing <br /> Grade PLAN <br /> NTS <br /> 6 of California Stormwater BMP January <br /> 6 Handbook 2003 <br /> construction <br /> www.cabmphc3ndbooks.comm <br /> REVISIONS GHA PROJECT NO. 180641 CIVIL ENGINEER- ?,oFESS/o, <br /> DEVELOPER: Underground Service Ale�� MSL L IN-N-OUT BURGER EROSION CONTROL PLAN <br /> IN-N-OUT BURGER ;EVORE 0 Call: Toll Free ENGINEERING, INC. 4F LATHROP MARKETPLACE <br /> 1�� G) <br /> 13502 HAMBURGER LANE -,e -z <br /> CIVIL ENGINEERS AND LAND SURVEYORS SPECIALIZING IN SITE DEVELOPMENT M 1131 TITLE SHEET <br /> 402 WEST ARROW HWY., SUITE 4, SAN DIMAS, CA. 91773 Uj No. 38382 M SHOPPING CENTER PAD <br /> E] E] BALDWIN PARK, CA. 91706 Arch itecture/Developm ent <br /> CONTACT: KORI SEKI 14901 Quorum Drive (909) 305-2395 FAX (909) 305-2397 16514 GOLDEN VALLEY PARKWAY <br /> TWO WORKING DAYS Suite 300 C/vl\- <br /> 1@ U 1� n 12 (626) 813-8275 BEFORE YOU DIG Dallas Texas 75254 N <br /> OF C LATHROP, CA 95330 a, <br /> Ph: (972) 239-8884 NJ -9 OAI�6Z,�� 10-25-18 <br /> Fax: (972) 239-5054 MARK S R.C.E. 38382 DATE C7 �c <br /> A 18023-18023 C7ecpts <br />