My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2820
>
1600 - Food Program
>
PR0535398
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2022 2:54:15 PM
Creation date
8/18/2020 8:45:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0535398
PE
1625
FACILITY_ID
FA0020413
FACILITY_NAME
MCDONALDS #32054
STREET_NUMBER
2820
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95377
APN
24802019
CURRENT_STATUS
01
SITE_LOCATION
2820 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL PLUMBING NOTES ABBREVIATIONS I C2 <br /> C2 <br /> GENERAL: BELOW 45 PSI STATIC, A PRESSURE BOOSTER SYSTEM SHALL BE INSTALLED. ACM AREA CONSTRUCTION MANAGER <br /> 1 . ALL WORK PERFORMED SHALL BE IN ACCORDANCE WITH ALL LOCAL CODES <br /> AND ACCEPTABLE TO THE AUTHORITY HAVING JURISDICTION. 4. IF THE RESTAURANT HAS A COMBINED WATER AND FIRE SPRINKLER SERVICE, <br /> THE INCOMING WATER SERVICE SHALL BE SIZED BASED ON THE FIRE AVB ATMOSPHERIC VACUUM BREAKER <br /> 2. ALL PLUMBING WORK SHALL BE PERFORMED BY A LICENSED PLUMBER. SPRINKLER CONTRACTOR'S HYDRAULIC CALCULATIONS. <br /> 3. ALL DIMENSIONS, CLEARANCES AND TOLERANCES SHALL BE VERIFIED PRIOR 5. PROVIDE A MINIMUM Y2" ANNULAR CLEARANCE AROUND ALL PIPE SLAB <br /> TO INSTALLATION. ALL ROUGH-IN LOCATIONS SHALL BE COORDINATED WITH PENETRATIONS. BSI BEVERAGE SYSTEM INSTALLER <br /> THE MANUFACTURER'S SUBMITTAL INFORMATION. <br /> 6. A REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTER (RPZ) SHALL BE <br /> 4. ALL DIMENSIONAL INFORMATION IS AS FOLLOWS (UNLESS NOTED OTHERWISE): INSTALLED AT THE INCOMING SERVICE WHERE REQUIRED BY CODE. CO CLEAN-OUT <br /> A. UNDERGROUND PIPE IS TO FOUNDATION z <br /> 0 <br /> B. OVERHEAD PIPE IS TO FINISHED WALL 7. AN EXPANSION TANK SHALL BE INSTALLED ON THE COLD WATER LINE INLET <br /> C. ELEVATIONS ARE TO FINISHED FLOOR TO THE WATER HEATER. SEE EXPANSION TANK SCHEDULE. DC DOWNSPOUT COVER <br /> v <br /> 5. ALL MATERIALS, FIXTURES AND EQUIPMENT USED SHALL BE IN ACCORDANCE 8. ALL WATER SUPPLY PIPE WITHIN 5 FT. OF THE BUILDING AND INSIDE THE w <br /> WITH McDONALD'S SPECIFICATIONS. SPECIFICATIONS ARE CONTAINED WITHIN BUILDING SHALL COMPLY WITH NSF 61 AND SHALL BE TYPE L COPPER DFU DRAINAGE FIXTURE UNIT(S) <br /> THESE DRAWINGS AND THE McDONALD'S PROJECT MANUAL. ANY CONTRACTOR TUBING, COPPER PIPE OR CPVC PIPE. <br /> IN NEED OF A COPY OF THE McDONALD'S PROJECT MANUAL SHALL CONTACT <br /> THE McDONALD'S AREA CONSTRUCTION MANAGER. ANY VARIANCE FROM THE 9. CPVC PIPE SHALL BE FLOWGUARD GOLD OR FLOWGUARD BENDABLE AS EC ELECTRICAL CONTRACTOR <br /> McDONALD'S SPECIFICATIONS SHALL BE REVIEWED AND APPROVED BY THE MANUFACTURED BY LUBRIZOL. <br /> ENGINEER-OF-RECORD. 10. CPVC PIPE SHALL BE CONNECTED WITH FLOWGUARD GOLD YELLOW LOW-VOC <br /> 6. SEE COORDINATION SCHEDULE FOR ADDITIONAL SCOPE OF WORK. <br /> SOLVENT CEMENT AS MANUFACTURED BY IPS WELD-ON OR OATEY. FAC FIRE ALARM CONTRACTOR <br /> 7. ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH ITS LISTING 11 . ALL CPVC PIPE SHALL BE INSULATED TO PREVENT EXPOSURE TO GREASE. <br /> FCO FLOOR CLEAN-OUT <br /> AND/OR THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. 12. ALL SUSPENDED PIPE SHALL BE SUPPORTED AS FOLLOWS: <br /> 8. WHERE POOR SOIL CONDITIONS EXIST OR WHERE SUBSTANTIAL SETTLEMENT MATERIAL MAX. HORIZ. SPACING MAX. VERT. SPACING FD FLOOR DRAIN <br /> OF EITHER THE PIPING, THE BUILDING OR ADJACENT WALKS, PLANTERS, ETC., COPPER PIPE 12 FT. 10 FT. w <br /> MAY OCCUR, THE CONTRACTOR SHALL PROVIDE ADEQUATE UNDERSLAB COPPER TUBING <Q4" 6 FT. 10 FT. Q <br /> STAINLESS STEEL PIPE HANGERS OR APPROVED OTHER SUPPORT. COPPER TUBING >Q2" 10 FT. 10 FT. FPC FIRE PROTECTION CONTRACTOR <br /> 9. ALL PIPE SLEEVES SHALL BE PROPERLY SEALED AND INSULATED TO PREVENT ICPVC <1 " 1 3 FT. 10 FT. <br /> HEAT LOSS AND SEEPAGE. ICPVC >Q4" 4 FT. 10 FT. w <br /> FS FLOOR SINK <br /> 10. ALL PIPE INSULATION SHALL BE PROTECTED FROM DAMAGE FROM PIPE 13. A REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTER (RPZ) SHALL BE <br /> HANGERS. PROTECTION SHALL BE LIGHT GAUGE GALVANIZED STEEL OR INSTALLED AT THE INLET TO THE WATER FILTRATION SYSTEM. ALL PIPING <br /> DOWNSTREAM OF THE RPZ SHALL BE COPPER OR CROSS-LINKED <br /> EQUAL. GC GENERAL CONTRACTOR <br /> POLYETHYLENE (PEX). Q�oME.ss,Ur <br /> 11 . ALL PENETRATIONS OF FIRE-RATED WALLS SHALL BE FIRESTOPPED WITH AN �� � <br /> APPROVED AND LISTED FIRESTOPPING SYSTEM. 14. ALL DEVICES, APPLIANCES, AND APPARATUS INTENDED TO SERVE SOME GI GREASE INTERCEPTORz <br /> SPECIAL FUNCTION SHALL BE PROVIDED WITH PROTECTION AGAINST BACKFLOW 3431 m <br /> SANITARY AND VENT SYSTEMS: AND CONTAMINATION OF THE WATER SUPPLY SYSTEM. ALL BACKFLOW <br /> PREVENTION DEVICES SHALL BE ASSE LISTED AND APPROVED FOR THE DEVICE lihhJ!� ti <br /> 1 . THE BUILDING SANITARY PIPE SHALL BE LOCATED A MINIMUM OF 5 FT. FROM sj Ati <br /> THE INCOMING WATER SERVICE. WHERE A 5 FT. SEPARATION IS NOT OR APPLIANCE THEY SERVE. GPF GALLONS PER FLUSH �r OF CAO1- yA <br /> POSSIBLE, THE BOTTOM OF THE WATER SERVICE PIPE SHALL BE A MINIMUM 15. ALL WATER SUPPLY LINES SHALL BE PROVIDED WITH A QUARTER-TURN I��I <br /> OF 12 IN. ABOVE THE TOP OF THE HIGHEST POINT OF THE SANITARY PIPE. SHUT-OFF VALVE BEFORE FINAL CONNECTION TO EQUIPMENT. GPM GALLONS PER MINUTE <br /> 2. ALL SANITARY AND VENT PIPE SHALL BE PVC TYPE DWV, ABS OR CAST-IRON 16. QUARTER-TURN SHUT-OFF VALVES SHALL BE INSTALLED UPSTREAM OF ANY r d c <br /> WHERE REQUIRED BY CODE. , N <br /> INLINE BACKFLOW PREVENTION DEVICE. GW GREASE WASTE O Q <br /> 3. ALL HORIZONTAL SANITARY PIPE SHALL BE INSTALLED WITH A MINIMUM PITCH , w <br /> AS FOLLOWS: 17. ALL VALVES AND BACKFLOW PREVENTION DEVICES SHALL BE INSTALLED WITH o <br /> PIPE SIZE MIN. SLOPE FITTINGS THAT FACILITATE REMOVAL IN CASE OF FAILURE. HS HAND SINK 4c <br /> 2Y2" OR LESS %4" PER FT. 18. ALL OVERHEAD WATER LINES SHALL BE INSULATED WITH 1 " THICK EXTERNAL Immom <br /> 3" TO 6" Y8" PER FT. JACKETED INSULATION AND A MINIMUM INSTALLED R-VALUE OF 3.7. I.P.S. IRON PIPE SIZE (ALSO NPS) y <br /> 8" OR LARGER %6" PER FT. <br /> 19. PRIOR TO BUILDING TURNOVER, THE DOMESTIC WATER SUPPLY SYSTEM SHALL ILI. <br /> 4. CLEANOUTS SHALL BE INSTALLED IN ALL HORIZONTAL DRAINAGE PIPE AND BE PURGED OF DELETERIOUS MATERIAL AND DISINFECTED. DISINFECTION KFI KITCHEN EQUIPMENT INSTALLER W <br /> SHALL BE LOCATED NOT MORE THAN 100 FT. APART. SHALL BE DONE IN ACCORDANCE WITH THE LOCAL HEALTH CODE, PLUMBING E <br /> CODE OR IN ACCORDANCE WITH AWWA C651 OR AWWA C652. m <br /> 5. CLEANOUTS SHALL BE INSTALLED AT ALL CHANGES OF DIRECTION GREATER KFS KITCHEN EQUIPMENT SUPPLIER O a ^S1p <br /> THAN 45 DEGREES. WHERE MORE THAN ONE CHANGE OF DIRECTION OCCURS Q a'6 o <br /> IN A SINGLE PIPE RUN, ONLY ONE (1 ) CLEANOUT SHALL BE REQUIRED FOR �m `- U <br /> EVERY 40 FEET OF DEVELOPED LENGTH. <br /> Li o� �P <br /> x '01 <br /> LAV LAVATORY <br /> 6. CLEANOUTS SHALL BE INSTALLED ON PIPES PRIOR TO ANY SLAB <br /> PENETRATION. " °T <br /> MC MECHANICAL CONTRACTOR ° o -00 a o 1) o <br /> 7. WHERE PIPING IS LOCATED WITHIN WALL CAVITIES, ACCESS TO THE CLEANOUTS o a ° <br /> SHALL BE PROVIDED. VALVE SCHEDULE J ° � ° 6 <br /> MHT MALE HOSE THREADS a J ° o a a o 0 <br /> 8. CLEANOUTS ON 6IN. AND SMALLER PIPES SHALL BE PROVIDED WITH A ° <br /> � a � <br /> o <br /> CLEARANCE OF NOT LESS THAN 18 IN. CLEANOUTS ON 8-IN. AND LARGER TEMP. o ° - <br /> o o �� Q <br /> PIPE SHALL BE PROVIDED WITH A CLEARANCE OF NOT LESS THAN 36 IN. MANUFACTURER MODEL SETTING LISTING SERVES MS MOP SINKQ <br /> ° � ° Q) <br /> WATTS LFMMV 104°F ASSE 1017,1069,1070 LAVS & HAND SINKS MIXINGQ) E °� o <br /> 9. ALL SUSPENDED SANITARY AND VENT PIPE SHALL BE SUPPORTED AS ZURN ZW3870XLT 104°F o ::3 <br /> a o.° Q <br /> FOLLOWS: 0 ° ° <br /> NIBCO S-FP-600A-LF - - COMB' OVEN WATER SHUT OFF NPS NATIONAL PIPE THREAD STANDARD O° ° a 3 a <br /> U 0 <br /> c °a <br /> WATTS LFFBV-PEX - - COMBI OVEN RO WATER SHUT OFF � ° °Q 6 <br /> MAX. HORIZ. MAX. VERT. 0 -6 U .0 o ° c 0 <br /> MATERIAL SPACING SPACING <br /> CCS co <br /> ABS 4 FT. 10 FT. NPT NATIONAL PIPE THREAD TAPERED c .E X o <br /> C N - <br /> C (� Z ° T U <br /> J~ •� ° a N <br /> V Y WV 4 FT. 10 FT. <br /> CAST-IRON (<10 FT. PIPE SECTIONS) 5 FT. 15 FT. m - <br /> CAST-IRON (10 FT. PIPE SECTIONS) 10 FT. 15 FT. COORDINATION SCHEDULE 0/0 OWNER/OPERATOR (D ° o <br /> Q ' 7� U N <br /> .- (n .� (n o � (n w <br /> FINAL NOTES: Q <br /> 10. ALL PLUMBING FIXTURES SHALL BE VENTED AND THE MAXIMUM DISTANCE �-_(o .L ° .° <br /> 1 . THIS SCHEDULE IS INTENDED AS A GUIDE FOR THE WORK TO BE ° ° L - ° <br /> FROM THE FIXTURE TRAP TO THE VENT SHALL BE AS FOLLOWS: OH OVERHEAD Q -° o � U. ° ,, <br /> GENERAL REQUIREMENTS FURNISH INSTALL CONNECTION NOTES PERFORMED. ALL WORK SHALL BE COORDINATED BOWED THE <br /> TRAP SIZE SLOPE DISTANCEo o° o ° T o <br /> MECHANICAL PERMIT MC 1 -3 McDONALD'S AREA CONSTRUCTION MANAGER AND ALL GC AND U o a <br /> ° � Q <br /> 0 0 SUBCONTRACTORS. - 3 <br /> 1Y4" /4" PER FT. 2' 6" � L <br /> 1Y2" Y4" PER FT. 3'-6" HOT WORK (WELDING) PERMIT (IF APPLICABLE) KES 1 -3 / P PUMP o .- <br /> PLUMBING PERMIT PC 1 -3 <br /> ° ° <br /> 2" %4" PER FT. 5'-0" 2. ONE (1) COPY OF THE DECOR PACKAGE DRAWINGS SHALL BE <br /> ELECTRICAL PERMIT EC 1 -3 SUPPLIED TO THE GENERAL CONTRACTOR AND EACH OF THE 0 ° o (D.0 o <br /> 3" /8" PER FT. 6'-0" PC PLUMBING CONTRACTOR Q ° c > <br /> FIRE SPRINKLER PERMIT (IF APPLICABLE) FPC 1 -3 SUBCONTRACTORS. IT SHALL BE THE RESPONSIBILITY OF THE w ° o o w <br /> 4" & LARGER %8" PER FT. 1 0' 0" FIRE ALARM PERMIT (IF APPLICABLE) FAC 1 -3 GENERAL CONTRACTOR AND THE SUBCONTRACTORS TO INSURE ~ ° 3 � ' �' <br /> 1 1 . ALL PLUMBING VENTS THROUGH THE ROOF SHALL TERMINATE A MINIMUM OF CONTRACTOR COORDINATION REQUIREMENTS THAT THEY HAVE RECEIVED THE DECOR PACKAGE DRAWINGS. <br /> 18 INCHES ABOVE THE ROOF AND SHALL BE LOCATED A MINIMUM OF 8 FT. RC REFRIGERATION CONTRACTOR <br /> FROM ANY PARAPET WALL. WHERE A VENT TERMINATES WITHIN 8 FT. OF A PLUMBING SYSTEMS 3. FOR ANY WORK NOT CLARIFIED IN THIS SCHEDULE OR IN THE <br /> PARAPET WALL, THE VENT SHALL TERMINATE A MINIMUM OF 6 INCHES ABOVE WATER HEATERS PC PC PC 1 -4 NOTES AND SPECIFICATIONS, PLEASE CONSULT THE McDONALD'S REDUCED PRESSURE PRINCIPLE <br /> THE PARAPET. HOT AND COLD WATER PIPE PC PC PC 1 -4 AREA CONSTRUCTION MANAGER FOR SCOPE OF WORK. RPZ BACKFLOW PREVENTER <br /> 12. ALL PLUMBING VENTS SHALL TERMINATE A MINIMUM OF 10 FT. HORIZONTALLY LEGEND VENTS AND INTAKES PC PC PC 1 -4THERMOSTATIC MIXING VALVE PC PC PC 1 4 4. SEE PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION. <br /> FROM ANY OUTDOOR AIR INTAKE. WHERE A PLUMBING VENT IS LOCATED SS SANITARY SEWER <br /> WITHIN 10 FT. OF AN INTAKE, THE VENT SHALL TERMINATE A MINIMUM OF 2 POWER AND CONTROL WIRING EC EC EC 1 -5 5. SEE ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION. <br /> FT. ABOVE THE INTAKE. COLD WATER PIPING <br /> ST STORM SEWER <br /> 13. ALL SIDE WALL VENT TERMINATIONS SHALL BE PROTECTED TO PREVENT BIRDS <br /> OR RODENTS FROM ENTERING OR BLOCKING THE VENT OPENING. - - - - - - - TEMPERED WATER PIPING (1 107) <br /> PLUMBING FIXTURE SCHEDULESVB ANTI-SIPHON, SPILL RESISTANT <br /> 14. ALL FLOOR DRAINS THAT DO NOT SERVE EQUIPMENT SHALL BE PROTECTED VACUUM BREAKER r <br /> AGAINST DRYING OUT EITHER THROUGH THE INSTALLATION OF A TRAP PRIMER, HOT WATER PIPING (1407) TAG DESCRIPTION MANUFACTURER MODEL WATER USE ACCESSORIES/COMMENTS a <br /> DEEP SEAL TRAP OR PROSET TRAP GUARD. ZURN Z1400-SZ SEE DRAWINGS FOR PIPE SIZES <br /> FCO 6x6 FLOOR CLEAN OUT JAY R. SMITH 4040 SEE NOTE 8 TAB TEST AND BALANACE CONTRACTOR ~ <br /> 15. ALL APPLIANCES SHALL DRAIN TO AN APPROVED SANITARY WASTE RECEPTOR UNDERGROUND WASTE PIPING <br /> PIPE SIZE: 3" GRATE: HALF - NICKEL-BRONZE > <br /> (FLOOR SINK OR FLOOR DRAIN WITH FUNNEL). INDIRECT DRAINAGE FROM AN FS-2 8x8 FLOOR SINK WITH HALF-GRATE ZURN ZN1910 <br /> JAY R. SMITH 3415 DOME STRAINER: ALUMINUM SEE NOTE 8 UG UNDERGROUND Q <br /> APPLIANCE SHALL MAINTAIN AN AIR GAP BETWEEN THE PIPE OUTLET AND THE (� <br /> TOP OF THE RECEPTOR. THE MINIMUM DISTANCE BETWEEN THE PIPE OUTLET _ _ _ _ _ _ _ HS-1 STAINLESS STEEL HAND SINK ADVANCE TABCO 7-PS-61 FAUCET: INCLUDED WITH SINK SEE NOTES 6 & 10 Q J z m <br /> VENT PIPINGO o <br /> AND THE TOP OF THE RECEPTOR SHALL BE TWICE THE DIAMETER OF THE U Z o w u <br /> APPLIANCE DRAIN PIPE. NOTES: UR URINAL w � < <br /> 1 . SEE McDONALD'S PROJECT MANUAL FOR ADDITIONAL MANUFACTURERS TO ORDER PLUMBING FIXTURES, U � � <br /> DOMESTIC SUPPLY SYSTEMS: EXISTING UNDERGROUND WASTE PIPING 2. PLUMBING CONTRACTOR SHALL COORDINATE WITH G.C. TO PROVIDE BLOCKING FOR PROPER URINAL SUPPORT CONTACT HD SUPPLY: CD w0 <br /> 1 . THE INCOMING WATER SERVICE PIPE SHALL BE LOCATED A MINIMUM OF 5 FT. 3. PLUMBING CONTRACTOR SHALL COORDINATE WITH G.C. TO PROVIDE INTERIOR BLOCKING ON W/W BUILDING FOR WALL CLAMP PHONE: (866) 310-3576 V VENT m a o <br /> FROM THE EXITING SANITARY PIPE. WHERE A 5 FT. SEPARATION IS NOT 4. YARD HYDRANT IS FOR TRASH CORRAL - SEE SITE PLAN FOR LOCATION E-MAIL: MCDCOORD@HDSUPPLY.COM :5 z � w <br /> POSSIBLE, THE BOTTOM OF THE WATER SERVICE PIPE SHALL BE A MINIMUM THERMOSTATIC MIXING VALVE 5. PLUMBING CONTRACTOR SHALL ROUTE %$" DRAIN PIPE FROM HOSE BIBB TO NEAREST FLOOR DRAIN OR FLOOR SINK Q u J o n CO <br /> OF 12 IN. ABOVE THE TOP OF THE HIGHEST POINT OF THE SANITARY PIPE. 6. PLUMBING CONTRACTOR SHALL COORDINATE WITH G.C. TO PROVIDE BLOCKING FOR PROPER SINK SUPPORT WC WATER CLOSET u� Z z < Ld <br /> 7 . SEE KITCHEN DRAWINGS FOR ADDITIONAL INFORMATION - PLUMBING CONTRACTOR SHALL COORDINATE INSTALLATION WITH K.E.S. 0 Fh z o <br /> 2. ALL UNDERGROUND SITE PLUMBING SHALL CONFORM TO NSF 61 , SHALL BE ® CLEAN-OUT (FLOOR OR YARD) 8. PLUMBING CONTRACTOR SHALL SPECIFY CONNECTION MATERIAL/TYPE WHEN ORDERING (� o <br /> TYPE K COPPER TUBING OR COPPER PIPE, POLYETHYLENE (PE) OR CPVC. 9. PLUMBING CONTRACTOR SHALL SPECIFY BURY DEPTH WHEN ORDERINGLi O X w <br /> WCO WALL CLEAN-OUT <br /> IF CPVC IS USED, FOAM INSULATION SHALL BE INSTALLED AT ALL CHANGES 10. PLUMBING CONTRACTOR SHALL PROVIDE GRID DRAIN, P-TRAP AND VALVE STOPS FOR ALL SINKS & LAVS N LTJ o ' o <br /> OF DIRECTION TO ACCOUNT FOR EXPANSION AND CONTRACTION. ® FLOOR DRAIN <br /> 3. INCOMING WATER SERVICE PRESSURE SHOULD BE BETWEEN 45 AND 55 PSI WSFU WATER SUPPLY FIXTURE UNIT(S) o <br /> STATIC. WHERE WATER PRESSURE SERVICE EXCEEDS 80 PSI STATIC, AN <br /> FLOOR SINKp 49 0 <br /> APPROVED WATER-PRESSURE REDUCING VALVE WITH STRAINER CONFORMING Imw <br /> TO ASSE 1003 SHALL BE INSTALLED. WHERE INCOMING WATER PRESSURE IS YC YARD CLEAN-OUT GENERAL NOTES <br />
The URL can be used to link to this page
Your browser does not support the video tag.