Laserfiche WebLink
Jul , 2 . 2019 3106PM Donlee Pump Co No , 2195 P , 6 <br /> UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM Page 4 of 6) <br /> VIII . MONITORING SYSTEM AND PROGRAMMING <br /> This sectlon must be completed if a monitoring panel is used to perform leak detection monitoring, Y N NA <br /> Are the visual and audible alarms operational? 0 ❑ ❑ <br /> Were all sensors visually Inspected for kinks and breaks in the cables and for residual buildup to ensure that ftoals move freely, ® ❑ ❑ <br /> functionally tested, and confirmed operational? <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not Interfere with their ® ❑ ❑ <br /> proper operation? _ <br /> Was monitoring system sel•up reviewed to ensure proper settings? m ❑ ❑ <br /> Was the monitoring panel's backup battery visually Inspected , functionally tested, and confirmed operational? M Cl ❑ <br /> Does the flow of fuel stop at the dispenser if a leak is detected In the under-dispensor containment? ® ❑ ❑ <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or Is electrically ® ❑ ❑ <br /> disconnected ? <br /> Does the turbine aulomallcally shut doom if the piping secondary Containment monitoring system detects a leak? ® ❑ ❑ <br /> Which sensors Initiate positive shut down? (Check all that apply.) ® Sump ® Under-dispenser containment <br /> if alarms are relayed to a remote monitoring station, is ail communications equipment (e •g• modem) operational? ❑ ❑ i61 <br /> For any answer of "N" above, describe In section W how and when these deflolencles were or will be corrected. <br /> IX. COMMENTS <br /> I <br /> X, IN -TANK GAUGING TESTING <br /> not complete this section <br /> ® Check this box if tank gauging Is used only for Inventory control. (Do p ) <br /> ❑ Check Oils box if NO tank gauging equipment is Installed, (Do not complete this section.) Y N NA <br /> This section must he completed if in-tank augh) is used to perform leak defection monitoring, <br /> I Has all Input witfng been Inspected for kinks and breaks in the cables and for proper entry and termination , including testing for ground ❑ ❑ ❑ <br /> I faults? <br /> Were all indank gauging probes visually Inspected for damage and residue buildup to ensure that floats move freely, functionally tested, rno ❑ ❑ <br /> and confirmed operational? <br /> Was accuracy of system's product revel readings tested? 11 111Nas accuracy of system's water level readings tested? ❑ 11Were all probes reinstalled properly? ❑ [I <br /> Were all items on the equipment manufacturers maintenance checklist completed? ❑ p ❑ <br /> Forany answer of "N" above, desorlhe in sectlon Xl how and when these deficlericles were or will be corrected. <br /> XI . COMMENTS <br /> i <br /> I <br /> 1AL tHEAUC <br />