Laserfiche WebLink
Jul . 2 , 2019 3 : 06PM Donlee Pump Co No . 2195 P . 7 <br /> UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page $ of c) <br /> X114 LINE LEAK DETECTOR TESTING <br /> Check this box if Ilse leak detectors {LLD) era NOT installed. (Do not complete this Sedlon) Y N NA <br /> Tills section must be completed if LLDs are Installed. <br /> Was a leak simulated to verify LLD perfomtance? I(I ❑ ❑ <br /> Check ell that s t . Simulated leak rate verified: t� 3 GPH C10. 1 GPH 0.2 GPH <br /> Was the1esting apparatus properly calibrated? ® Q ❑ <br /> For emergency generator lank systems , does the LLD create an audible and visual alarm when a leak Is detected? ❑ ❑ <br /> For mechanical LLbs, does the LLD restrict the flow through the pipe when a teak is detected? ® ❑ ❑ <br /> For electronic LLDs , does the turbine automatically shut off when a leak is detected? Q <br /> For electronic LLDs, does the turbine automatically shut off If any portion of the monitoring system is disabled or disconnected? Q ❑ <br /> For electronic LLDs, does the turbine automi shut off if any portion of the monitoring system malfunctions or fails a test? 11 El0 <br /> For electronic LLDs, have all accessible wiring connections been visually inspected for kinks and breaks? ❑ d <br /> Were all items on the equipment manufacturer's maintenance checklist completed? ® ❑ ❑ <br /> Were all LLDs confirllned operational Wthln regulatory requirements? ® O ❑ <br /> For anv answer of "N" above describe In section Xlil how and when these issues were or will be corrected. <br /> XIII, COMMENTS <br /> P <br /> XIV. VACUUM l PRESSURE/ HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> Check this box If VPH monitoring Is NOT used . (Do not complete this section.) <br /> Tills section must be Completed if VPN mor►Itoring Is used to perform leak detection monitoring. <br /> System Type (Mark all that apply) ❑ Vacuum ❑ Pressure C1 Hydrostatic <br /> Sensor FuncUonallty Interstitial Communication <br /> Sensor ID Component(s) Monitored by this Sensor Test . Test <br /> ❑ Pass ❑ Fall ❑ Pass ❑ Fall <br /> ❑ Pass Q Fall ❑ Pass ❑ Fail <br /> CJ Pass ❑ Fall [1 Pass ❑ Fail <br /> ❑ Pass ❑ Fall ❑ Pass ❑ Fall <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> d Pass ❑ Fall ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fall ❑ Pass ❑ Fall <br /> ❑ Pass ❑ Fail ❑ Pass p Fail <br /> j ❑ Pass ❑ Fall ❑ Pass Q Fail <br /> ❑ Pass ❑ Fall I] Pass ❑ Fall <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fall <br /> D Pass p Fail ❑ Pass d Fail <br /> ❑ Simulated leak at far ends of the Interstitial space. ❑ Visual Inspection <br /> How was interstitial communicall in verined? ❑ Other (Describe the method in seCflon XV below.) CI Gauge <br /> Was the vacuum or pressure restored to operating levels in all Interstitial spaces? ❑ Yes Q No (Descrlbe the reason in section XV below.) <br /> Foran answer of "PAIL " above describe in secffon XV how and when these issues were or will be corrected. <br /> XV. COMMENTS <br />�I <br />