My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2022 11:27:47 AM
Creation date
8/18/2020 11:08:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OPW Installation,Operation,and Maintenance Manual, Page 76 Executive Order VR-102-Q <br /> STEP 7: DRILL HOLES ously apply sealant to the first 6 male threads on the <br /> With the inlet tube in place, carefully drill (3) 1/8"diam- valve body as shown in figure 10. Make sure coverage <br /> eter pilot holes through the drop tube and inlet tube at is completely around the threads,and work the sealant <br /> three locations at 120 degree intervals around the tube, down into the thread profile. Quickly thread the lower <br /> 1 inch below the flange. Using the pilot holes, drill(3) tube onto the valve body. Tighten the tube securely by <br /> 5116"dia.holes through the tubes. Remove the burrs hand or with a strap wrench. Remove excess sealant <br /> from the drilling operation from the inside of the drop and smooth sealant bead with water moistened mixing <br /> tube assembly with a fine half round file. <br /> IMPORTANT: Allow sealant(epoxy)tocurefor24 <br /> IMPORTANT:A 5116"drill bit must be used. Do not hours before Installing Into tank. <br /> substitute any other size drill bit. <br /> 44011 Seat=:ancrea, <br /> Xr first 6 welds <br /> Figure 10 <br /> i NOTE: Before installing the valve in the tank,a Pres- <br /> _ J sure test can be performed on the valve to check for <br /> vapor tightness, Seal off both ends of the tube with <br /> Figure 7 inflatable plumber's plugs.Apply a maximum 10"W.C. <br /> STEP 8: ASSEMBLE AND SEAL CLINCH STUDS (1/3 PSI)air pressure. If pressure does not hold and a <br /> leak can be located with soap solution, do not install <br /> Loosely assemble the the valve. Send the valve back to OPW for warranty <br /> three(3)clinch studs,lock evaluation. Caution: Do not over-pressure. Excess pres- <br /> washers,and nuts in sure can damage the valve. <br /> holes. Do not tighten at \ /Apply Sealant STEP 11: CUT LOWER TUBE AT 45 ANGLE <br /> this time. Mix up a small — <br /> amount of sealant. Gen- Measuring from the underside of the inlet tube flange, <br /> erousl eeach clinch stud apply sealant un- \ J r mark the overall length of the drop tube a distance of <br /> y pprr ) / (B)minus 6"or as per local codes or requirements. De- <br /> head,each <br /> eea 1,I <br /> hach nut,and on ; termine dimension(8)from the measurements taken in <br /> the outside of the tube p // Step 1,Figure 1 (Top of the Face Seal Adaptor below the <br /> around the holes. __ drain valve outlet in the spill container to the bot-tom <br /> of the tank). Saw off the excess tube at a 45-degree <br /> angle,and file off any sharp burrs(Refer to Figure 16). <br /> Optional: Install the OPW Tank Bottom Protector on the <br /> Figure 8 lower tube (Refer to Installation instructions supplied <br /> with the Tank Bottom Protector). <br /> STEP 9:TIGHTEN SELF-CLINCHING STUDS STEP 12: PREPARE FILL RISER FOR VALVE INSER- <br /> Tighten clinch studs securely with a%"wrench. Use TION <br /> only the self-clinching studs that are supplied with the IMPORTANT:Inspect the riser pipe for any foreign ma- <br /> unit. Seating torque is 11.5 ft-lbs min.to 13.5 ft-lbs terial. Over spray from tank relining or any internal <br /> max. Do not over tighten. Note:Failure to properly burrs inside of pipe must be removed prior to instaila- <br /> apply and cure the sealant may result in a failure of a tion. Failure to have an unobstructed riser pipe may <br /> pressure decay leak test. prevent proper installation or operation of the valve. <br /> STEP 10: LOWER TUBE ASSEMBLY Thoroughly clean top of riser pipe. <br /> If a vise is used,clamp on the valve body casting only to <br /> avoid damage to the float. Mix the remaining sealant <br /> until the color is uniform. Using the mixing stick,gener- <br />
The URL can be used to link to this page
Your browser does not support the video tag.