Laserfiche WebLink
OPW Installation, Operation, and Maintenance Manual, Page 77 Executive Order VR-102-0 <br /> I PORTANT: Before installing the valve,allowseal- CAUTION:No obstruction in the tank can be within 13" <br /> nt to cure for 24 hours. from the center of the riser pipe or the valve may not <br /> operate properly. <br /> STEP 16:ALIGN VALVE <br /> STEP 13: REMOVE ELASTIC BAND Install the DPW Jack Screw Kit and a 4"nipple to lock <br /> Remove the elastic band securing the float to the valve the valve in place. Refer to the Installation Instructions <br /> body. The float will move into an outward position. supplied with the Jack Screw Kit. Install the Rotatable <br /> STEP 14: INSERT DROP TUBE Product Adaptor(Refer to Installation Instructions sup- <br /> Make sure the 0-Ring gasket is under plied with the Rotatable Product Adaptor.) Make sure <br /> the flange of the inlet tube. Hold the that the valve does not rotate while tightening the <br /> float down against the valve body and adaptor by observing the position of the deflector. The <br /> slowly insert the drop tube overfill valve valve must remain aligned along the length of the tank <br /> into the riser pipe. Donotforcevalve ' '-� asinStep15. Repeat this step as necessary to assure <br /> into the riser pipe. Ifanyobstructionor �' proper valve alignment. <br /> foreign matter interferes with smooth <br /> •nca F�o••ery c 1 Fx <br /> insertion of the valve,the riser pipe must <br /> becleared. <br /> WARNING Failure to follow the assem- <br /> bly and installation instructions or use <br /> of excessive force to insert the DPW a <br /> 6150 will VOID THE WARRANTY[ SP,, <br /> Difficulty in removing the existing fill saP" 1 <br /> tube(if there is one)means there may <br /> be an obstruction in the riseri e. Look <br /> P P :earance•c <br /> for burrs,deformations,excess tank lin- r"Pp,rt." <br /> w�+a <br /> ing material or other projections that may interfere with _____1_____________ <br /> easy insertion of the DPW 61 SO.The6lSOisdesigned . <br /> for insertion into schedule 40 pipe. If schedule 80 pipe 1 <br /> has been used forthe riser,the 61 SO cannot be in- =ar.A«v t.'vr,P•Tr. <br /> stalled. If seamed pipe has been used,the internal weld <br /> bead may interfere with the DPW 6180 and prevent Figure 16 <br /> installation. If the OPW 61 SO won't slip in easily DON'T <br /> FORCE ITI Damage to the valve may result if excess <br /> force is used. Examine the riser pipe carefully;deter- <br /> mine the nature of the obstruction; take appropriate <br /> steps to remove it. <br /> STEP 15:CHECK INSTALLATION <br /> N+c4' <br /> Insert the drop lube all the way into gift <br /> the tank until the flange and gasket <br /> seat onto the top of the Face Seal <br /> Adaptor. The float will swing out <br /> into the operating position as it - <br /> passes into the tank. Make sure <br /> that the float is aligned along the I , <br /> length of the tank. The length of <br /> the tank can easily be determined <br /> by locating other manholes or <br /> pump boxes that are installed Figure 16A <br /> around other tank fittings. LookIs <br /> into the drop tube and align the deflector <br /> with the length of the tank. <br />