My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2022 11:27:47 AM
Creation date
8/18/2020 11:08:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OPW Installation , Operation , and Maintenance Manual , Page 74 Executive Order VR- 102-Q <br /> ®Registered T. M. Owens Corning Fiberglass Corporation ASSEMBLY INSTRUCTIONS <br /> Tape measure IMPORTANT : Each of the numbered steps in the instal - <br /> �i <br /> .f lation instructions are designed as a CHECK LIST to en - <br /> sure proper installation and trouble free operation of the <br /> OPW61 SO Overfill Prevention Valve . <br /> F= <br /> Read and follow these steps carefully , checking them off <br /> as you proceed . <br /> Riser <br /> Pipe Figure numbers correspond to step numbers for easy r; <br /> with ( ) <br /> To Tank ( ) reference . <br /> Face <br /> peal Adaptor <br /> Top To ti <br /> ( I . ) Tank STEP 1 : MEASURE <br /> Botom Install theOPWFace SealAdaptorandthe OPWThread - <br /> on Spill Container on the Fill Riser ( Refer to the Installa - <br /> tion Instructions Supplied with the Spill Container) . In - ri <br /> serf a tape measure through the riser pipe and hook it <br /> under the inside of the tank in the lengthwise direction . <br /> EXAMPLEH. <br /> Measure the distance from the top of the Face Seal <br /> 1 ) For an Owens-Corning Model G3 Fiberglass@ Tank Adaptor threads inside the base of the spill container <br /> Calibration Chart : bucket just below the drain valve outlet window to the <br /> Tank Capacity 10 , 000 gal . , nominal 9 , 403 gal . inside , top lip of the storage tank ( Dim . " A" ) <br /> NOTE : Use actual capacity only ( See Figure 1 & 1A) . <br /> 2) 95 % of actual tank capacity = 0 . 95 x 9403 gal . = The top flange on the 61 SO will rest on the Face Seal114 <br /> 8933 gal . Adaptor just below the drain valve outlet , and be locked <br /> 3 ) The closest numberwhich is less than 8933 gal . Is in place between the Face Seal Adaptor and the 4" <br /> 8910 gal . Choosingthe closest number less than <br /> nipple that is installed in the spill container with the E <br /> 95 % of actual capacity ensures that the initial Jack Screw Kit ( See Figure 1 A) . ( For riser pipe configu - <br /> shutoff will occur when the tank is no more than rations other than that shown , consult installation <br /> 95 % full , drawings or use other necessary means to measure Di - <br /> 4 ) The calibration chart reading of 8910 galcorre- mension "A" ) . Ej <br /> sponds to a dipstick measurement of 82 " , Using a tape measure , measure the distance from the top <br /> 5 ) Dipstick number ( X ) = 82" of the Face Seal Adaptor in the spill container to the <br /> Tank diameter (Y ) = 92" bottom of the tank ( Dim . "B ") <br /> (Y ) - ( X} _ (Z) ( 92 " - 2 " = 10 " ) IMPORTANT : Inspect the riser pipe for any foreign ma- <br /> (Z) = 10 teri al . Over spray from tank relining or any internal burrs <br /> 6 ) (Z) <br /> 2 " = C ( 10" - 2" = 8") inside of pipe must be removed prior to installation . 1 <br /> C = 8" <br /> Failure to have an unobstructed riser pipe may prevent <br /> proper installation and operation of the valve . The 61 SO <br /> 7 ) Is 8" less than 6- 112"? <br /> is designed for installation into schedule 40 riser pipes . j <br /> The 61 SO cannot be installed into schedule 80 riser <br /> NO Measure the distance from the top of the FSA- pipes . <br /> €; <br /> 400 Face Seal Adaptor installed on the riser pipe STEP 2 : MARKTHETUBE <br /> to the inside , top lip of the storage tank and Use the result from Step 1 and HOW TO LOCATE THE <br /> obtain measurement (A) . POSITION OFTHE 61 SO AT 95% TANK CAPACITYto j <br /> — mark the upper tube . Measure the distance from the <br /> Upper tube length C + (A} <br /> point where the upper tube and valve body meet . For <br /> " C " measurements greater than 6- 1 /2 " use tape <br /> measure to mark the calculated upper tube length onto <br /> the upper tube . <br /> j <br /> I i <br /> i <br /> I� <br />
The URL can be used to link to this page
Your browser does not support the video tag.