My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013565
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRADITION
>
1401
>
2600 - Land Use Program
>
PA-2000126
>
SU0013565
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2021 8:52:21 AM
Creation date
8/18/2020 3:02:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013565
PE
2611
FACILITY_NAME
PA-2000126
STREET_NUMBER
1401
Direction
S
STREET_NAME
TRADITION
STREET_TYPE
ST
City
MOUNTAIN HOUSE
Zip
95391-
APN
20945039
ENTERED_DATE
8/6/2020 12:00:00 AM
SITE_LOCATION
1401 S TRADITION ST
RECEIVED_DATE
8/17/2020 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jeffrey Adams, PhD, PE (CONTINUED) <br /> 1000 Howe Road—Martinez, CA <br /> Project Engineer. Jeff provided a phase-one environmental site assessment for the project. In <br /> addition, he provided a preliminary geotechnical report for this property that has been used as a <br /> trucking company's storage yard. The project is a residential development that consists of single- <br /> and multiple-story detached residential units. <br /> Jefferson Street Development—Oakland, CA <br /> Project Manager. Jeff served as Project Manager. He provided comprehensive environmental <br /> and geotechnical consultation services for a Brownfields redevelopment project in downtown <br /> Oakland. The project included several challenges, including limited site access due to onsite <br /> business activities, environmental impact related to previous site use, and the presence of several <br /> adjacent mid-rise structures. Jeff developed cost effective remedial value engineering solutions <br /> to mitigate the presence of geotechnically and environmentally-constraining subsurface solutions. <br /> Jeff worked with the design team to establish cost-effective retaining wall and foundation systems, <br /> designed and observed a subsurface environmental mitigation program, and assisted in the <br /> design of a structure wide vapor barrier. The project, serving as a cornerstone of the revitalization <br /> of downtown Oakland, is an excellent example of Jeffs proficiency in delivering cost effective <br /> solutions to facilitate Brownfields redevelopment. The project consists of a multi-story residential <br /> condominium structure. <br /> San Ramon Village Plaza—Dublin, CA <br /> Project Manager. Jeff served as Project Engineer. He contributed to an environmental peer review <br /> of previous land uses, which included a former dry cleaner. Further investigation identified impact <br /> due to former site operations. Jeff assisted in a remediation program, closely collaborating with <br /> other consultants representing differed parties of the property transaction. The site was efficiently <br /> remediated, allowing for redevelopment. The project consists of a high-density residential <br /> development within the 4.68-acre mixed-use San Ramon Village Plaza site. The project consists <br /> of a high-density residential development within the 4.68-acre mixed-use San Ramon Village <br /> Plaza site. <br /> Los Banos Airport—Los Banos, CA <br /> Project Engineer. Jeff provided a Phase I Environmental Site Assessment and a Conceptual Soil <br /> Remediation Work Plan as part of a multi-phase development. In addition to the Phase I <br /> Environmental Site Assessment he provided a soil and groundwater characterization program. <br /> The Los Banos Airport project measures approximately 112 acres in area. <br /> Questa @ Neighborhood H - Mountain House—Mountain House, CA <br /> Project Manager. Jeff served as project manager. He assisted in the preparation a phase one <br /> environmental site assessment in fall 2010. Under Jeff's leadership, the project team was able to <br /> effectively navigate through the complex historic records and ownership legacy associated with <br /> the property. The report that satisfied the demands and deadline of both the ownership entity and <br /> the financial institutions associated with the property. ENGEO performed a phase I environmental <br /> site assessment on the finished lots within Questa @ Neighborhood H of the Mountain House <br /> project. <br /> Lockheed Martin Storm Water Pond No 4—Sunnyvale, CA <br /> Project Manager. Jeff provided permitting consultation services, including the federal and state <br /> permitting required for the maintenance of a stormwater detention system. Jeff has also provided <br /> geotechnical and environmental support to evaluate the geotechnical conditions of the site. He <br /> also determined the absence of environmentally impacted materials within the site area. The site <br /> consists of a stormwater detention basin measuring approximately 4.5 acres in area and located <br /> adjacent to sensitive habitat. <br /> ENGEO <br /> Expect Excellence <br />
The URL can be used to link to this page
Your browser does not support the video tag.