Laserfiche WebLink
Chapter 6 <br /> The Performance Report <br /> 6.1 Before Preparing the Report <br /> Generators subject to SB 14 shall prepare a performance report with sufficient de- <br /> tails to convey an understanding of the hazardous waste management approaches <br /> used at the site (22 CCR Section 67100.8). <br /> The Hazardous Waste Management Performance Report (Performance Report) docu- <br /> ments a generator's current efforts and effectiveness in managing hazardous waste. <br /> The Performance Report includes discussions of the generator's approaches to man- <br /> aging hazardous waste including source reduction, on-site and off-site recycling, treat- <br /> ment and disposal. It can also serve as a way for the generator to share with the public <br /> all of the positive efforts made to improve the management of hazardous waste at the <br /> generator's site. <br /> The Performance Report should contain sufficient detail to convey an understanding <br /> of the hazardous waste management approaches used at the site. The use of narra- <br /> tives, photographs, illustrations, figures and data is encouraged. Keep in mind that the <br /> public has the authority to review your Performance Report. <br /> A generator who qualifies as a small business, and who is also required by 22 CCR <br /> Section 66262.41 to prepare a USEPA biennial generator report (BGR), may use the <br /> most recent BGR as the Performance Report required by SB 14. <br /> 6.2 General Site Information n <br /> s <br /> The Performance Report must contain the following general facility information: <br /> • Name of the site. <br /> • Location of the site including the street address, city, county and zip code G� <br /> for the site. In the case of multiple sites, identify all sites by street ad- <br /> dress, city, county and zip code for each site location. M <br /> • Four-digit Standard Industrial Classification (SIC) code applicable to C <br /> activities at the site. A list of SIC codes is in Appendix C. Use the one p <br /> code that best describes the operations occurring at the site. The SIC <br /> code should be the same as the code used for the Plan. <br /> A <br /> If a generator owns multiple sites with similar operations and chooses to prepare a M <br /> multisite Performance Report, only one SIC code should be used to represent all <br /> 47 <br />