My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1206
>
2300 - Underground Storage Tank Program
>
PR0231175
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2022 10:45:32 AM
Creation date
8/20/2020 1:19:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231175
PE
2361
FACILITY_ID
FA0001247
FACILITY_NAME
ARCO 07147
STREET_NUMBER
1206
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
1206 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
® GErntR - RYA N kc. Exhibit 8 GR Job # 19202056 . 1 <br /> Required Items in Conducting P=201.3 <br /> ( Executive Orders VR-201W and VR-202W ) <br /> The instructions below are required when conducting TP- 201 . 3 for these systems . The <br /> tester shall document that each step was followed as indicated below and shall include <br /> this page of the Exhibit with the submission of TP- 201 . 3 test results . Note that districts <br /> may require use of an alternate form to meet these requirements, provided the alternate <br /> form includes the same minimum parameters . <br /> 1 . Prior to conducting TP-201 . 3, all four ball valves on the Healy Clean Air <br /> Separator (CAS ) shall be closed , as shown in Figure 1 or Figure 1H , to isolate it <br /> from the Underground Storage Tank ( UST) system to permit the pressurization <br /> of the UST system . Figure 1 applies to vertical CAS installations and Figure 1H <br /> applies to horizontal CAS installations . <br /> 2 . Conducting TP-201 .3 with any dispenser piping test valve in the closed position <br /> is not permitted . Any dispenser with a dispenser piping test valve in the closed <br /> position while conducting TP- 201. 3 will bias the test towards compliance . <br /> 3 . After conducting TP-201 . 3 , the four ball valves on the Healy Clean Air Separator <br /> (CAS) shall be locked in their normal operating positions as shown in <br /> Figure 21B-2 or 21]1-2H , Exhibit 2 of Executive Orders VR-201-M and VR-202- M . <br /> Figure 28-2 applies to vertical CAS installations and Figure 213-2H applies to <br /> horizontal CAS installations. <br /> Required Steps Verification <br /> ( please check Yes or No ) <br /> 1 . All four CAS ball valves closed before conducting TP-201 . 3 <br /> QYes � No <br /> 2 . All dispenser piping test valves open before conducting <br /> TP-201 . 3 Yes F] No <br /> 3 . All four CAS ball valves in normal operating position after <br /> conducting TP-201.3 . QYes F] No <br /> Testing Company: Gettler-Ryan Inc. Facility Name . co 7147 <br /> Elodio Sanchez (4 A <br /> 10 / 30 / 2019 <br /> Print Name (Technician ) Signature Date <br /> ICC Cert: # 8887127 Exp . 6 / 4 / 2020 <br /> Technician Certification Number and Expiration Date <br /> ( ICC or District Training Certification, as Applicable) <br /> Items Required in Conducting TP-201 . 3, Exhibit 8 - Executive Orders M201- M and M202W <br /> i <br /> i <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.