Laserfiche WebLink
DO NOT loosen the stainless steel retaining bands <br />securing the bellows to the containment bucket top <br />ring or the containment bucket bottom. Loosening <br />the retaining bands voids any and all warranties on <br />this product. <br />Warning: <br />If the cover is removed, for any reason, follow <br />the Service and Maintenance instruction as <br />noted. Always remove the existing _gaskets and <br />install new _gaskets. Never reuse the old <br />_gaskets. Reuse of gaskets may result in an <br />improper seal. <br />Operation and Maintenance: <br />After each fuel delivery, the operator must <br />remove any standing fuel from the container. <br />Fuel can be removed by actuating the drain <br />valve or with a gasoline absorbing disposable <br />towel. Annually: Inspect and clean the interior <br />of the spill container and drain valve screen. <br />Remove accumulated dirt and grit. If the drain <br />valve screen becomes clogged, remove the <br />valve, soak in water and use high-pressure air to <br />clean. Reinstall the drain valve to its proper position <br />and test the valve per the appropriate California Test <br />Procedure. If problems persist, replace the drain <br />valve with P/N 1 DK-2100-EVR (specified torque <br />11.5 ft -lbs min to 13.5 ft -lbs max, 5/16-18 UN <br />thread). The sealable cover (1 SC) adjustment <br />nut is set at the factory, but due to <br />environmental conditions it may be necessary <br />to adjust it to either improve sealing or ease <br />cover removal. <br />Testing Spill Containers <br />Use California Test Procedures. Their Test <br />Procedures will check the seals between the drain <br />valve, nipple and rotatable adapter. To test the spill <br />containers base and bellows fill the container with <br />water. A drop in the water level of 1/16" or greater <br />after one hour means that a leak exists. To <br />determine where the leak is, look for a steady <br />stream of bubbles coming from one of the joints or <br />water leaking on the outside of the bucket. NOTE: <br />Do not drain the water into the UST after the test is <br />complete. Water must be disposed of per local <br />requirements for hazardous waste. If the leak <br />cannot be corrected the spill container should be <br />replaced with another. <br />POMECO recommends periodic inspection of covers <br />anI seals as a part of the regularly scheduled <br />maintenance program. If any of the seals are <br />damage they should be replace. Only qualified, <br />competent, well-trained technicians should perform <br />maintenance. <br />Note: Common sense and good judgment should <br />always be exercised. The contractor's <br />understanding of all related site conditions prior to <br />starting the project is essential. If the contractor <br />does not have a clear understanding of the required <br />work and site conditions, the contractor is advised to <br />seek clarification prior to starting any portion of the <br />project. <br />Important: Leave these instructions with Station <br />Operator as per GARB Requirements <br />OPW. <br />A DOVER coM <br />wuuv <br />P.O. Box 405003 *Cincinnati, Ohio 45240-5003 <br />1-800-422-2525 Domestically <br />513-870-3315 I nternational ly <br />Marketing Agent for POMECO by OPW, Inc. <br />Copyright, 2002 -OPW Fueling Components Inc., Cincinnati, OH <br />Printed in U.S.A. p/n H14976PA — 09/02 <br />POMECO Multi port Spill Container Page 4 <br />