Laserfiche WebLink
r <br /> UNDERGROUND STORAGE TANK1 12 <br /> MONITORING SYSTEM CERTIFICATION FORM ( Page s of s) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : <br /> If you already have a site plan that shows all required information, you may include it, rather than this page i p� Q�j(o- fir ',� sFetr LTH <br /> Certification Form . The site plan must show the general layout of tanks and piping and clearly identify locations o flee Lot . i <br /> if installed: 1 monitoring system control panels; 2 In-tank liquid level robes (if used for leak detection); 3 devi 1. rn6r&6�lh tea k <br /> ) g Y P ) � q p (� ) ) g <br /> annularspaces or vault, 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment, 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> Monitoring System Certification <br /> UST Monitoring Site Plan <br /> ; - - - -- -- - - - - ---- - - -' -- - - - - - - - - - — - - - — -- - -— <br /> Site Addre=s: FLAME LIQUORS CHEVRON 1301 W. KETTLEMEN LANE LODI CA 95240 <br /> KEY <br /> E = FILLS <br /> T = TLIMENE *PIPING } <br /> P = PROBE (ARROWS) <br /> V = VAPOR Drawing of piping <br /> X = SUN IF SENSOR exit of sump and <br /> L = Leak DetectorUDC's. No <br /> ai = 111ann• y . . . . . . . STORE underground <br /> . . - . <br /> B = Brine Sensor drawing is uawa%� <br /> I = Smart Sensor wre cannot <br /> S = 5TP speculate blue <br /> C = bloats & Chains pis' <br /> E = E Stop . . . <br /> . . . .87. ATG V '� <br /> 91 UA 87 <br /> . . . . . DIE _ . . . . . . . . . . . . . . . . . - - • - - • - - . - . . <br /> T ( I <br /> A?V item: tatdargrou?rd that ara notvitible to the cer1((yir4r tecknfcimi are a <br /> ` professional opution onb, and aresole&for itlfor national pwpo.&:. Drawuy <br /> nor to scale <br /> - - - - KETTLENL?,N LANE - - - - - - - <br /> Date map was drawn : 3-28- 18 <br /> Instructions <br /> If you already have a diagram that shows all required information, you may include_ it, rather than this page, with your Monitoring System Certification. On your site plan , <br /> shove thegeneral layoutof tanks and piping. Cleady identify locations of the. following equipment, if installed: monior.°ng system ccnhul panels; sensors monnorng Sank <br /> annular spaces, sumps , dispenser pans, spill containers, or other secondary containment areas: mechanical or efectronfa line leak detectors; and in-tank liquid level <br /> probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br /> LEGEND <br />