Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> SPILL CONTAINER TESTING REPORT FORM ( Page 1 of 1 ) <br /> Type of Action ❑ Installation Test ❑ Repair Test 0 12 Month Test <br /> I . FACILITY INFORMATION <br /> CERS ID Date of Spill Container Test { <br /> 10180585 3/28/2019 <br /> Business Name (Same as Facility Name or DBA-Doing Business As) <br /> RUPI - FLAME LIQUOR <br /> Business Site Address City ZIP Code <br /> 1301 W KETTLEMAN LANE LODI , CA 95242 <br /> II . UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Test (Print as shown on the ICC Certification.) Phone # <br /> DAVID WINKLER ( 209 ) 744 - 0112 <br /> Contractor / Tank Tester License # ICC Certification # ICC Certification Expiration Date <br /> 08- 1739 Ex . 3/31 /20 8883059- UT 1 /29/2020 <br /> Spill Container Testing Training and Certifications (List applicable certifications.) <br /> Franklin Fueling - EBW & Phil Tite # 10009853708 Ex. 11 /29/20 <br /> OPW # 104-633 Ex. 3/ 14/2020 tri <br /> III . SPILL CONTAINER TESTING INFORMATI N IL <br /> Test Method Used : ❑x Manufacturer Guidelines (Specify): WATER TEST <br /> ❑ Industry Code or Engineering Standard (Specify) : <br /> T <br /> ❑ Engineered Method (Specify) : E�V1R0NM �NT <br /> Attach the testing procedures and all documentation required to determine the results. # of Ada,ched 'Pages <br /> TANK ID : (By tank number, stored product, etc) 87 91 DSL <br /> Spill Container Manufacturer: OPW OPW OPW <br /> Method of Cathodic Protection : ❑x Non-Metallic ❑x Non-Metallic Z Non-Metallic ❑ Non-Metallic <br /> ❑ Isolation ❑ Isolation ❑ Isolation ❑ Isolation <br /> ❑ Other (Specify in V) ❑ Other (Specify in V.) ❑ Other (Specify in V.) El Other (Specify in V.) <br /> Inside Diameter of Spill Container: (Inches) 12 12 12 <br /> Depth of Spill Container: (Inches) 14 14 14 <br /> Does the spill container have a 5 gallon capacity? 0 Yes El No E] Yes E] No HI Yes ❑ No ❑ Yes ❑ No <br /> Method to Keep Spill Container Empty: ❑x Drain Valve 0 Drain Valve ❑x Drain Valve ❑ Drain Valve <br /> ❑ Onsite Pump ❑ Onsite Pump ❑ Onsite Pump ❑ Onsite Pump <br /> ❑ Other (Specify in V) ❑ Other (Specify in V) ❑ Other (Specifyin V) ❑ Other (Specifyin V.) <br /> IV. SUMMARY OF TESTING RESULTS <br /> Spill Container Test Results: 0 Pass ❑ Fail ❑x Pass ❑ Fail ❑x Pass ❑ Fail ❑ Pass ❑ Fail <br /> V. COMMENTS <br /> Any items marked `Fail" above must be explained in this section. Any additional comments may also be provided here. <br /> VI . CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS TESTING <br /> I hereby certify that the spill containers were tested in accordance with California Code of Regulations , Title 23, Division 3, <br /> Chapter 16, Section 2637. 1 and all the information contained herein is accurate. <br /> UST Service Technician Signature <br /> If the facility has more components than this form accommodates, additional copies of this page may be attached. <br /> CERS = Califomia Environmental Reporting System, ID = Identification , UST = Underground Storage Tank, ICC = International Code Council <br />