Laserfiche WebLink
TOWN & COUNTRY CONTRACTORS, INC. WORK PLAN <br /> 9 . Secure site <br /> If the excavation is not immediately filled in , a secure fence will be installed around its <br /> perimeter. <br /> 10 . Backfill and Surface Restoration <br /> Excavated site will be backfilled with a combination of clean import material and excavated soil <br /> if concentrations are les than acceptable backfill action levels . Backfill will be placed in 1400t <br /> lifts and compacted . Site will be restored to initial grade and either reseeded or paved to <br /> match original conditions . <br /> 11 . Tank Removal Documentation <br /> After the tank removal , the following will be submitted to SAN JOAQUIN HEALTH AGENCY <br /> and CITY OF LODI FIRE DEPARTMENT HAZMAT AND VALLEY AIR SJ : <br /> Rinsate Manifest <br /> Tanks disposal certificate <br /> Site map with sample locations and identifications <br /> Complete analytical results , including chain of custody and laboratory quality assurance and <br /> control sheets . <br /> Documentation of stockpile quantity and disposition <br /> Summary of work : <br /> 1 ) The tank will be delivered to : Republic Services Forward , Inc , 999 S Austin , Manteca CA <br /> 95336 , the hauler : Belshire Environmental Services , 25971 Towne Center Drive , Foothill <br /> Ranch CA , a California License Hauler . <br /> 2 ) The rinsate will be delivered to : Demenno Kerdoon -World Oil , 2000 N Alameda St , Compton , <br /> CA hauled by Nieto and Sons , Hauler 43374 PO Box 760 , Yorba Linda , California <br /> 3 ) Upon determination if the soil is contaminated , it will be offhauled to Republic Services <br /> Forward , Inc California , the hauler : Belshire Environmental . <br /> 4 ) There will be no cutting of the tanks onsite . <br /> 5 ) Backfilling of the tank hole will not take place until written authorization is given from San <br /> Joaquin County Health Services Agency and City of Lodi Fire Department HAZMAT . <br /> I <br /> I <br /> Work on the UST' s will commence once the Authority to Construct is issued for removal the <br /> Underground Storage Tanks and piping . The timeline for the work will take a minimum of 8 <br /> working days to a maximum of 15 working days once the authority is received from the <br /> SJCEHD , City of Lodi Fire Department HAZMAT, VALLEY AIR and City of Lodi building , <br /> planning and arrangements have been made with the owner. <br /> E <br />