Laserfiche WebLink
6erraR4Yax INC GR Job # 1820 - 2542 <br /> SWRCB, January 2006 <br /> F. In-Tank Gauging l SIR Equipment: 0 Check this box if tank gauging is used only for inventory control <br /> ❑ Check this box if no tank gauging or SIR equipment is installed <br /> This section must be completed It in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> es ❑ Nc Has all input wiring been inspected for proper entry and termnation, including testing for ground faults? <br /> 0 Yes ❑ No' Were all tank gauging probes visually inspected for damage and residue buildup? <br /> (a Yes ❑ No' Was accuracy or system products level readings tested? <br /> Yes ❑ No' Was accuracy of system water level readings tested? <br /> I] Yes ❑ No' Were all probes reinstalled property? <br /> El Yes ❑ No' Were all Items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H. Felow, describe how and when these deficiencies were or will be corrected. <br /> G . Line Leak Detectors (LLD) : ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> 0 es ❑ No& For equipme- rit slartoup or annual equipment certification, was a leak simulated to verity performance c ec a <br /> ❑ NIA that apply) Simulated leak rate: [3 3 g p.h, 0 1 g.p h. [] 0.2 g p.h. <br /> ❑, Yes ❑ No' Were a] LLDs confirmed operational and accurate within regulatory requirements? <br /> © Yes D No' Was the testing apparatus property calibrated? <br /> Yes ❑ No' For Mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br /> ❑, NIA <br /> 0 Yes ❑ No' For electronic LLDs , does the turbine automatically shut off if the LLD detects a leak? <br /> CI NIA <br /> Yes ❑ No' For electronic LLDs , does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> [( NIA Disconnected? <br /> Q Yes ❑ No' For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> ❑ N/A falls a test? <br /> Yes [i No' For electronic LLDs , have all accessible wiring connections been visually inspected? <br /> 13N/A <br /> Q Yes ❑ No' 1were all items on the equipment manufacturer's maintenance checklist completed? <br /> In Iho action H, below, describe how and when these deficiencies were or will be corrected. <br /> G . Comments : <br /> Monitoring System Certification Page 3 of 4 12/07 <br /> 3 <br />