Laserfiche WebLink
PARTNER William A. Mitchell, PG <br /> Partner Associate <br /> Education <br /> Post-Graduate Studies in Geology - California State University, Long Beach <br /> B.S. in Geology - University of California, Davis <br /> Certificate Program, Hazardous Materials Management - University of California, Irvine <br /> Certificate Program, Site Assessment and Remediation - University of California, Irvine <br /> Registrations <br /> California Professional Geologist (PG), No. 6372 <br /> Training <br /> 40-hour HAZWOPER and annual 8-hour refresher courses (current) <br /> Highlights <br /> 30+ years performing Environmental Due Diligence Assessments: Phase I / II Environmental Site <br /> Assessments (ESAs); Transaction Screen Assessments; Remediation; Environmental Desktop Reports; and <br /> groundwater monitoring <br /> 30+ years with conducting environmental investigations, including visual asbestos and lead-based paint <br /> surveys, radon sampling, and visual mold/water intrusion inspections of multi-family residential, <br /> commercial, and industrial properties <br /> 3+ years in the Geotechnical field conducting foundation testing and monitoring services <br /> 3+ years in the Engineering Geology field conducting geologic inspections, geologic/seismic investigations, <br /> and other engineering geology projects <br /> Experience Summary <br /> Mr. Mitchell is a seasoned Environmental Professional and registered Professional Geologist. He is familiar <br /> with all aspects of Environmental Due Diligence reporting and consulting for various purposes, to include: <br /> transactional/lender due diligence, regulatory closure, real estate re-development, etc. He has conducted <br /> ESAs on a variety of property types and has conducted over 2,500 Phase I ESAs, and over 600 Phase II ESAs, <br /> over the past 30 years. <br /> Facilities include: multi-family residential buildings and developments; hospitals; schools/education; <br /> mortuaries; manufacturing sites; commercial offices; and warehouses. Also performed assessment services <br /> for mass-transit projects, siting proposed alignments for light-rail transportation projects. Phase II <br /> Environmental Site Assessments have included soil, soil vapor, and groundwater sampling, UST <br /> removals/closure investigations,and monitoring removal of contaminated soil during construction projects. <br /> Project Experience <br /> Environmental Site Assessment & Methane Gas Monitoring / Sewer Project / Los Angeles, CA. <br /> Performed methane gas assessments for a proposed 10-mile long sewer project in the Los Angeles area. <br /> Project involved a Phase I ESA as well as the installation of methane gas monitoring wells, and the <br /> subsequent sampling and analysis of gas contained within the wells. <br /> 800-419-4923 www.PARTNEResi.com <br />