Laserfiche WebLink
DTSC Guidance for the PBR (FTU) Closure: <br /> DEPARTMENT OF TOXIC SUBSTANCES CONTROL <br /> CLOSURE REOUIREMENTS <br /> FOR <br /> GENERATORS&TIERED PERMITTING FACILITIES <br /> FEERJARY 20CC <br /> HAZ.NVASIE GENERATOR CONIDMONAL EXE-AEMON CONDRIONAI.AT-MO=ITION PERMffr EM RE= <br /> [TTtilFM <br /> Type of Onsite Onsite Onsite Onsite-TPU&FTU <br /> Facility <br /> Closure Title 22 CCR 66262.34(a)(1) Ceueratur Requirements Plus: Generator Requirements Plus: Title 22 CCR 67450.3(b)(13)(A)-TCU <br /> Requirements Specified requirements apply to 90 Title 22 CCR 67450.3(c)(11)(A)-FTU <br /> day generators with certain tanks, H&SC 25201.5(d)(8)(A) H&SC 25200.3(8)(1) Maintain compliance with the following <br /> containers,drip pads,and Requires removal or decontamination of all haz.waste! Requires removal or decontamination of all closure requirements:Section <br /> containment buildingsconstituents resulting from unit closure. haz.waste/constituents resulting from unit 66264.178,66265.111(a)and <br /> Title 22 CCR 66265.197 closure_ 66265.111(h),66265114_ <br /> 90 day accumulation tanks and - - <br /> containers without secondary- H&SC 25201.5(d)(9) Title 22 CCR 67450.3(a)(11)(F)-TTU <br /> containment are subject to full Requires compliance with all generator requirements including Title 22 CCR 67450.3(c)(11)(B)-FTU <br /> closure requirements_ Title 22 66262 34(see Hazardous Waste Generator Applicable tank systems are subject to <br /> Title 22 CCR 66265.445(c)(1xA) requirements). additional closure requirements <br /> Drip pads(w/o liners)from wood H&SC 25201.5(e)(1) H&SC 25200.3(c)(4)(A) prtrsuant to Title 22,CCR,Article 1 D, <br /> treatment facilities are subject to Exrrup s tanks and containers ancillary equipment from Exp tanks and containers ancillary Chapter 15. <br /> full closure requirements. 66265.193 requirements,if specified conditions are met:unless equipment from 66265.193 requirements,if <br /> Title 22 CCR 66265.1102 otherwise required by federal law. specified conditions are met,unless Title 22 CCR 66265.404 <br /> Containment building are subject Title 23 CCR 2672 otherwise required by federal law. Applies to owners and operators(OIO) <br /> to full closure requirements. Applies to the cleanup of contamination resulting from Title 23 CCR 2672 of facilities which treat hazardom <br /> underground tank closures. Applies to the cleanup ofcontamination wastes by chemical,physical,or <br /> Title 22 CCR 66265.111 Title 22 CCR 67383.1 to 67383.5 resulting from underground tank closures_ biological methods in other than tanks, <br /> Requires generator to close facility Requirements for the management of aboveground and Title 22 CCR 67383.1 to 67383.5 surface impoundments,and land <br /> in a manner that minimm es further underground tanks that held has.waste or hoz.materials and are Requirements for the management of treatment facilities.Requires that all <br /> maintenance and is protective of themselves classified as haz.wastes. aboveground and underground tanks that hazardous waste and hazardous waste <br /> public health and environmentheld hoz waste or haz_materials and are residues be removed from treatment <br /> Iitle 22 CCR 66265.114 themselves classified as hoz.wastes. processes or equipment,discharge <br /> Requires generator to properly control equipment,and discharge <br /> dispose of all contamination confinement structures. <br /> generated during closure. <br /> H.AZ.NVASTF GENERAIOR CONDFFIONAI.EXE-%EMON CONDMONAIL AUIHORTLATION PERMIT BY RE= <br /> (CCLIFTUD <br /> Closure Plan No written closure plan is required No written closure plan required unless a specified 90 day No written closure plan required unless a Title 22 CCR 67450.3(a)(13)(B)-TTU <br /> unless nae or more of the generator requirement applies. specified 90 day generator requirement Title 22 CCA 67450.3(c)(11)(B)-FTU <br /> following specified 90 day applies. Closure plan requirements.The plan <br /> generator requirements applies: must be kept onsite and does not have <br /> Title 22 CCR 66265.197(a) to be approved by CUPA or DISC. <br /> 90 day accumulation tanks and <br /> containers without secondary Title 22 CCR 67450.3(a)(13)(C)-TTU <br /> containment are subject to closure Title 22 CCR 67450.3(c)(11)(C)-FTU <br /> plan requirements specified in TTU-O/O shall amend the closure plan <br /> Article 7 of Chapter 15at any time during the active Life of the <br /> Title 22 CCR 66265.445(x)(1)(A) TTU(s)when changes in operating <br /> Drip pads(w/o liners)form wood plans or TTU design affect the closure <br /> treatment facilities are subject to plan.or whenever there is a change in <br /> closure plan requirements. the expected year of closure. <br /> Title 22 CCR 66265.1102(a) FFU-Amendments to the closure plan <br /> Cont umur l building are subject must comply with Section 66265.112(c). <br /> to closure plan requirements_ <br /> Closure Time Notification of closure maybe Same as generator requirements plus: Same as generator requirements plus: Title 22 CCR 67450.3(a)(13)(D)-TTU <br /> Requirements required by some local ordinances. Title 22 CCR 67450.3(c)(11)(D)-FTU <br /> &Notification H&SC 25201.5(d)(8)(A) H ECSC 25200.3(g)(1) O/O shall treat remove or dispose of all <br /> Upon terminating operations,the generator shall initiate closure Upon terminating operations,the generator hazardous waste within 90 days after <br /> activities by removing all waste residues. shall initiate closure activities by removing final volume is treated. <br /> all waste residues_ <br /> --- Title 22 CCR 67450.3(a)(13)(E)-TTU <br /> H&SC 25201.5(d)(9)(B) H&SC 25200.3(g)(2) Title 22 CCR 67450.3(c)(11)(E)-FTU <br /> Requires generator to provide written notification to DTSC and Requires generator to provide written Closure shall be completed within 180 <br /> the CUPA or the authorized unified program agency upon the notification to DTSC and the CUPA m the days aper treating final volume of <br /> completion of all closure activities. authorized unified program agency upon the hazardous waste. <br /> completion of all closure activities. <br /> Title 22 CCR 67450.3(a)(13)(F)-TTU <br /> Title 22 CCR 67450.3(c)(11)(F)-FIU <br /> O/O shall notify CUPA(and DTSC far <br /> TTUs)or authorized UP agency 15 <br /> days prior to completion of closure. <br />