My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1325
>
2231-2238 – Tiered Permitting Program
>
PR0543720
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2021 11:39:23 AM
Creation date
9/1/2020 4:29:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0543720
PE
2231
FACILITY_ID
FA0024706
FACILITY_NAME
METAL FINISHING SOLUTIONS - STOCKTON CA
STREET_NUMBER
1325
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
1325 EL PINAL DR STE 1
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
569
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
H.AZ.WASTE GENERATOR CONDMONAT.EXE11PT1ON CONDITIONAL AUTHORM-MON P1MlrT BV RL= <br /> (1TU&TU) <br /> Cerliflcatlon Certification of closure may be H&-SC 25201.5(d)(8)(B)Requires generator to submit H&SC 25200.3(g)(2) Title 22 CCR 67450.3(a)(13)(G)-TTU <br /> required by some local ordinances. certification when all treatment activities have Ceased. Requires generator to submit notification to Title 22 CCR 67450.3(c)(11)(G)-FTU <br /> DTSC and CUPA(Or authorized officer or Requires submittal of a certification <br /> agency if no CUPA)when all treatment signed by the OIO and a CA registered <br /> activities have ceased_ professional engineer stating closure <br /> completed in accordance with the <br /> CIO sure plan <br /> Financial Not required unless one or more Of Not required unless a specified generator requirement applies. H&SC 25245.4(b)(1)(B) H&SC 25245.4(a)(1)(B)-T1I1J&FTU <br /> Responsibility the fallowing specified 90 day Generator must obtain financial assurance for O/O must obtain financial assurance for <br /> generator requirements apply to closure on and after 1011196closure on and after 1011196. <br /> certain tanks/containers,drip pads, Title 22 CCR 67450.13(a)(5) Title 22 CCR 67450.13(a)(5) <br /> and containment buildings: Generator must obtain financial assurance for OIO must obtain financial assurance for <br /> Title 22 CCR 66262.34(a)(1) Closure on or after 10/1196. closure On or after 1011196. <br /> Financial responsibility Title 22 CCR 67450.13(a)(1) Title 22 CCR 67450.13(a)(1) <br /> requirements apply to gene rors Generator must prepare written cast estimate OIO must prepare written cast estimate <br /> for applicable tanks,containers for the CIO sure of each unit.Section for the closure of each unit.Section <br /> and drip pads,and containment 67450.13(a)(2)requires closure cost 67450.13(a)(2)requires closure cost <br /> buildings. estimate to be adjusted for inflation by estimate to be adjusted for inflation by <br /> Title 22 CCR 66265.197{a) March 1 of each year. March 1 of each year. <br /> 9C day accumulation tanks without -- <br /> secondary containment are subject Title 22 CCR 67450.13(d) H&SC 25245A(a)(1)(B)-TTU&FTU <br /> to financial responsibility Facilities with closure cost estimates below DIO must obtain financial assurance for <br /> requirements. $10,000 are allowed to self-certify in closure unless exempt. <br /> Title 22 CCR 66265.445(c)(1)lA] accordance with section 66270.11 that they Title 22 CCR 67450.l3(e)-TTL&FTU <br /> Drip pads(w/o liners)fivm wood have sufficient resources to meet closure OIO is exempt from finamual assurance <br /> treatment facilities we subject to cost requirementsrequirements if facility operated no <br /> financial responsibility more than 30 days in any calendar year. <br /> requirements. F rU exemption self-certification farm <br /> Title 22 CCR 56265.1102(a] must be submitted to CUPA or DTSC in <br /> Containment buildings are subject non-CUPA jurisdiction=exemption <br /> to financial responsibility self-certification must be submitted to <br /> requirements_ DTSC_ <br /> Wastestreams RCRA and Non-RCRAwaste Primarily non-RCRA waste and certain RCRA wastes pursuant Primarily non-RCRA wastes and certain Both non-RCRA wastes and certain <br /> to H&SC 25201.5(a)and(c) RCRA wastes pursuant to H&SC 25200.3(a) RCRA wastes pursuant to 67450.11- <br /> TTLT&1TC <br /> HA2.WASTE GENERATOR CONDITIONAL EX AEMON CONDITIONAL AUTHORIZATION PERAI IF BY RLI.E <br /> (1TC1FI[I) <br /> Relative Risk Low Low Law Medium <br /> to Public <br /> Health& <br /> Environment <br /> Corrective H&SC 25189.2(c)Prohibits the H&SC 251S9.2(c)Prohibits the on-site disposal ofbazardous H&SC 25189.2(c)Prohibits the On-site H&SC 25200.10(h)-TTU&FTU <br /> Action& on-site disposal of hazardous waste at an unauthorized point by a generator. disposal Of hazardous waste at an Requires corrective action for all haz. <br /> Phase I waste at an unauthorized point by unauthorized point by a generator. wastelconstituent releases. <br /> a generator. H&SC 25201.5(d)(8)(A)Requires generator to remove or H&SC 25200.3(c)(3) Title 22 CCR 67450.7-TTLT&FTU <br /> decontaminate all waste residues associated with the closure of Generator shall comply with Phase I Requires OIO to establish a cmrrective <br /> a unit including sails,and structures or equipment contaminated environmental assessment procedures per action program consisting of a Phase I <br /> with hzt ardous waste from the unit. H&SC 25200.14.Requires removal or environmental assessment and <br /> decontamination Of all haz. remediation if a release haz.waste or <br /> wastelconstituents resulting from unit constituents has occurred. <br /> closure.If contamination is found,generator <br /> is responsible for expeditious cleanup. <br /> H&SC 25187 Allows DTSC to H&SC.-25187 Allows DTSC to issue an Order specifying a H&SC 25187 Allows DTSC to issue an H&SC 25187-TTL&FTU <br /> issue an Order specifying a schedule for compliance or correction for any release ofhazorder specifying a schedule for compliance Allows DTSC to issue an order <br /> schedule for compliance Or waste or constituents into the environment. or correction for any release of hoz.waste Or specifying a schedule for compliance Or <br /> correction for any release ofhazconstituents into the environmentcorrection for any release of haz.waste <br /> waste or constituents into the or constituents into the environ. <br /> enviramment. H&SC 25404.1(a)(3)(A)Allows only DTSC H&SC 25404.1(a)(3)(A)Allows only <br /> to implement and enforce the requirements Of DTS C to implement and enforce the <br /> Sections 25200.3(c)(3)and 25200.14. requirements of Sections 2 5200.10 and <br /> 25200.14. <br /> Phase I not required. Phase l not required. H&SC 25200.14(b)(1) H&SC 25200.14(b)(1)-TTU&FTU <br /> Requires a Phase I environmental Requires a Phase I environmental <br /> assessment for all CA facilities_ assessment for all PBR facilities. <br />
The URL can be used to link to this page
Your browser does not support the video tag.