My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1325
>
2231-2238 – Tiered Permitting Program
>
PR0543720
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2021 11:39:23 AM
Creation date
9/1/2020 4:29:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0543720
PE
2231
FACILITY_ID
FA0024706
FACILITY_NAME
METAL FINISHING SOLUTIONS - STOCKTON CA
STREET_NUMBER
1325
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
1325 EL PINAL DR STE 1
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
569
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
H.A .WASTE GENERATOR CONDITIONAL EST\EPTION CONDITIONAL A=ORILITION PIMIT17 BT RE= <br /> (ITUXFLT) <br /> Post Closure Not required if clean closure. Not required if clean closure. Not required if clean closure. Not required if clean closure. <br /> H&SC 25199.2(c)prohibits the H&SC 25245.4(6)(3) H&SC 25245.4(.)(3)-TTU&FIT] <br /> on-site disposal of hazardous Generator shall not be required to provide Generator shall not be required to <br /> waste at an unauthorized point by rmancial assurances for post closure provide financial assurances for Post <br /> a generator. maintenance pursuant to H&SC 25245(a)(2). closure maintenance pursuant to H&SC <br /> 25245(a)(2)_ <br /> Post closure is not required unless If contantivation remains after closure,then <br /> ane or more of the following If contamination remains after closure_then the facility is also the facility is also subject to generator rf contamination remains at either <br /> specified 90 day generator subject to all applicable generator requirements,including requirements,including requirements for TILT&ITCafter closure,the owner) <br /> requirements apply to certain requirements for landfills,pursuant to H&SC 25201.5(d)(9) landfills,pursuant to H&SC 2.5200.3(c)(1) operator is subject to H&SC <br /> tauks/containers,drip pads,and 25200.10(b)which requires corrective <br /> containment buildings: action for all haz.waste/constitueut <br /> Title 22 CCR 66262.34(a)(1) releases_ <br /> Post closure requirements apply to <br /> generators for applicable tanks and Title 22 CCR 67450.3(a)(11)(F)-TTLT <br /> drip pads,and containment Title 22 CCR 67450.3(c)(9)(F)-FFC <br /> buildings. Post closure plan is required for tank <br /> Tide 22 CCR 66265.197(6} systems_ <br /> Post closure is required for tanks <br /> without secondary containment if <br /> all contaminated soils cannot be <br /> removed or decontaminated_ <br /> Title 22 CCR 66265445(c)(1 XB <br /> Post closure plan is required for <br /> drip pads(w/o liners)from wood <br /> treatment facilities which do not <br /> comply with liner requirements <br /> pursuant to 66265.443(b)(1). <br /> Tide 22 CCR 66265.1102(b) <br /> Post closure is required for <br /> containment buildings if all <br /> contaminated sails cannot be <br /> removed or decontaminated. <br />
The URL can be used to link to this page
Your browser does not support the video tag.