Laserfiche WebLink
5.1 Interviews <br /> 5.1.1 Interview with Owner <br /> Mr. Christopher J. Bennitt, subject property owner, was interviewed with two questionnaires provided by <br /> Partner during this assessment. Mr. Bennitt indicated that he was not aware of any pending, threatened, <br /> or past litigation relevant to hazardous substances or petroleum products in, on, or from the subject <br /> property; any pending, threatened, or past administrative proceedings relevant to hazardous substances <br /> or petroleum products in, on, or from the subject property; or any notices from a governmental entity <br /> regarding any possible violation of environmental laws or possible liability relating to hazardous <br /> substances or petroleum products. <br /> According to Mr. Bennitt, the subject property was developed with the existing building in the 1980s. He <br /> did not provide any information on any prior land use prior to the development of the existing building. <br /> Mr. Bennitt further stated that there are no USTs, ASTs, clarifiers, oil/water separators, groundwater <br /> monitoring wells, or hazardous substance use/storage/generation on the subject property to the best of <br /> his/her knowledge. <br /> 5.1.2 Interview with Report User <br /> Please refer to Section 5.2 below for information requested from the Report User. The information <br /> requested was not received prior to the issuance of this report. Because the Report User (Client) is a <br /> lender, it is understood that the Report User would not have knowledge of the property that would <br /> significantly impact our ability to satisfy the objectives of this assessment. The lack of this information is <br /> not considered to represent a significant data gap. <br /> 5.1.3 Interview with Key Site Manager <br /> Mr. Bennitt also serves as the key site manager; please see Section 5.1.1 above. <br /> 5.1.4 Interviews with Past Owners, Operators and Occupants <br /> Interviews with past owners, operators and occupants were not conducted since information regarding <br /> the potential for contamination at the subject property was obtained from other sources. <br /> 5.1.5 Interview with Others <br /> As the subject property is not an abandoned property as defined in ASTM 1527-13, interview with others <br /> were not performed. <br /> 5.2 User Provided Information <br /> 5.2.1 Title Records, Environmental Liens, and AULs <br /> Partner was not provided with title records or environmental lien and AUL information for review as part <br /> of this assessment. <br /> 5.2.2 Specialized Knowledge <br /> No specialized knowledge of environmental conditions associated with the subject property was provided <br /> by the User at the time of the assessment. <br /> Phase I Environmental Site Assessment PARTNER <br /> Project No. 17-184702.1 <br /> May 10,2017 <br /> Page 23 <br />